National Capital Planning Commission (USA) Meeting, March 6, 2025
Proceedings from the Meeting: Tidal Basin Development Concept Plan (MP314); Humphreys Engineer Center Vision Plan and Installation Planning Standards (MP202); Arlington National Cemetery Memorial Avenue Entry Corridor Area Development Plan (MP45a); Battleground National Cemetery Accessible Walkway and Landscape Improvements (8404); Joint Base Anacostia-Bolling Building 3623 Dorm Renovation and Stormwater Management (8627); President Lincoln's Cottage Interpretive Gardens (8629).
Bookmarks (click below to jump to listed time)
Time | Description | |
---|
(01m50s) | Report of the Chair | |
(03m10s) | Report of the Executive Director | |
(04m05s) | Legislative Update | |
(06m30s) | Tidal Basin Development Concept Plan | |
(52m24s) | Humphreys Engineer Center Vision Plan and Installation Planning Standards | |
(69m20s) | Arlington National Cemetery Memorial Avenue Entry Corridor Area Development Plan | |
(92m05s) | Battleground National Cemetery Accessible Walkway and Landscape Improvements | |
(103m12s) | Joint Base Anacostia-Bolling Building 3623 Dorm Renovation and Stormwater Management | |
(112m14s) | President Lincoln's Cottage Interpretive Gardens | |