National Capital Planning Commission (USA) Meeting, October 5, 2023
Proceedings from the Meeting: Bureau of Engraving and Printing Currency Production Facility, Beltsville, MD, Final site and building plans (8243); Pentagon Reservation Master Plan Update, Arlington, VA, comments on draft master plan (MP174).
Bookmarks (click below to jump to listed time)
Time | Description | |
---|
(3m22s) | Report of the Chair | |
(4m25s) | Report of the Executive Director | |
(5m10s) | Legislative Update | |
(5m28s) | Consent Calendar | |
(7m42s) | Bureau of Engraving and Printing Currency Production Facility, Beltsville, MD, Final site and building plan | |
(44m22s) | Pentagon Reservation Master Plan Update, Arlington, VA, comments on draft master plan | |