National Capital Planning Commission (USA) Meeting, July 7, 2022
Proceedings from the Meeting: Washington Union Station Expansion Project (7746); The Long Bridge Corridor Project (7819); Arlington National Cemetery Real Property Master Plan (MP45); Fort Belvoir North Area Distribution Center (8383); Information Presentation: New Smithsonian Museums Site Evaluation Study (8327-8328).
Bookmarks (click below to jump to listed time)
Time | Description | |
---|
(2m16s) | Report of the Chairman | |
(3m0s) | Report of the Executive Director | |
(4m26s) | Legislative Update | |
(5m22s) | Consent Calendar | |
(6m56s) | Washington Union Station Expansion Project | |
(140m19s) | The Long Bridge Corridor Project | |
(199m50s) | Arlington National Cemetery Real Property Master Plan | |
(224m57s) | Fort Belvoir North Area Distribution Center | |
(250m26s) | Information Presentation: New Smithsonian Museums Site Evaluation Study | |