[{"title":"SW Ecodistrict Featured on WAMU","description":"On April 17, 2015 NCPC Senior Urban Planner Diane Sullivan spoke with Washington\u2019s own WAMU radio station about the transformation soon to be underway in the SW Ecodistrict. The interview took place underneath the Department of Energy Building that spans across 10t Street (L\u2019Enfant Promenade).","date":"04\/30\/2015","author":"Diane Sullivan","link":"https:\/\/www.ncpc.gov\/news\/item\/8\/"},{"title":"SW Ecodistrict Joins National \u201cTarget Cities\u201d Program","description":"NCPC announced its participation in Target Cities, a two-year partnership of nine development projects across seven North American cities designed to amplify and accelerate district-scale community sustainability and create replicable models for next-generation urban revitalization. ","date":"06\/24\/2015","author":"Diane Sullivan","link":"https:\/\/www.ncpc.gov\/news\/item\/10\/"},{"title":"SW Business Improvement District Begins Operation","description":"The Southwest BID, a new Business Improvement District (BID) created in 2014 by the DC City Council, is now operating in the Southwest neighborhood. ","date":"09\/18\/2015","author":"Meghan Spigle ","link":"https:\/\/www.ncpc.gov\/news\/item\/21\/"},{"title":"NCPC Awards Contract to Sasaki","description":"The National Capital Planning Commission (NCPC), on behalf of the Pennsylvania Avenue Initiative Executive Committee, awarded a contract to Sasaki Associates to develop economic and urban design strategies for Pennsylvania Avenue between the White House and the U.S. Capitol. ","date":"10\/29\/2015","author":"Sarah Ridgely","link":"https:\/\/www.ncpc.gov\/news\/item\/11\/"},{"title":"Banneker Park Connection","description":"The National Park Service submitted a concept for the Banneker Park Connection to the National Capital Planning Commission for review at the April 7, 2016 Commission meeting. The new connection will allow people to easily access the waterfront from 10th Street, SW (L\u2019Enfant Promenade) and Banneker Park. ","date":"04\/11\/2016","author":"Diane Sullivan","link":"https:\/\/www.ncpc.gov\/news\/item\/9\/"},{"title":"Spy Museum under Construction","description":"Construction started in June 2016 on the International Spy Museum\u2019s new location on 10th Street, SW near L\u2019Enfant Plaza. ","date":"06\/20\/2016","author":"Diane Sullivan ","link":"https:\/\/www.ncpc.gov\/news\/item\/20\/"},{"title":"Renovation of the Mellon Memorial Fountain ","description":"The National Gallery of Art is engaged in a two-part renovation of the Mellon Memorial Fountain, located on a triangular piece of land across 6th Street, NW from the Federal Triangle\u2019s Apex Building and south of Pennsylvania Avenue, NW. The first phase was completed in time for the National Gallery\u2019s 75th Anniversary on March 17, 2016.","date":"08\/25\/2016","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/12\/"},{"title":"NCPC Unanimously Approves Final Square Guidelines for FBI Headquarters Site","description":"On January 5, 2017 the National Capital Planning Commission unanimously approved final square guidelines prepared by NCPC staff for redevelopment of the J. Edgar Hoover Building (FBI Headquarters) site located on Squares 378 and 379 in Washington, DC. ","date":"01\/05\/2017","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/17\/"},{"title":"NCPC Approves Banneker Park Pedestrian and Cyclist Access Improvements ","description":"At its April 6, 2017 monthly meeting the National Capital Planning Commission approved preliminary and final site development plans for access improvements at Banneker Park, submitted by the National Park Service and Hoffman-Madison Waterfront (developer of The Wharf). ","date":"04\/06\/2017","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/13\/"},{"title":"NCPC Reviews Draft Submission Guidelines and Environmental Policies and Procedures ","description":"The National Capital Planning Commission released drafts of the updated Submission Guidelines and Environmental Policies and Procedures for a 45-day public comment period. These are the primary guidance documents for the Commission\u2019s review of plans and projects, a core responsibility of the agency. ","date":"05\/04\/2017","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/14\/"},{"title":"Recap: Reconsidering Modernist Landscapes","description":"Nearly 200 people attended the May 15 event at the National Building Museum. After moderator Brad McKee (Landscape Architecture Magazine) introduced the idea of a fresh look at landscapes that may be \u201ctoo familiar,\u201d ","date":"05\/16\/2017","author":"Nick Bonard","link":"https:\/\/www.ncpc.gov\/news\/item\/15\/"},{"title":"More Development at Southwest Waterfront","description":"As the first phase of The Wharf nears completion in October 2017, developers submitted plans in May to the District of Columbia for the second phase. Pending zoning approval, construction could begin next year. ","date":"05\/20\/2017","author":"Meghan Spigle","link":"https:\/\/www.ncpc.gov\/news\/item\/18\/"},{"title":"GSA\/FBI Statement on FBI Headquarters","description":"The General Services Administration and the Federal Bureau of Investigation announce the decision to cancel the procurement for the new FBI headquarters consolidation project.","date":"07\/11\/2017","author":"GSA","link":"https:\/\/www.ncpc.gov\/news\/item\/22\/"},{"title":"NCPC Advances Memorial and Museum Projects","description":"At its July 13 meeting the National Capital Planning Commission (NCPC) reviewed and provided direction for several major commemoration and transportation projects that are in early development. ","date":"08\/01\/2017","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/23\/"},{"title":"Commission Approves Revised Submission Guidelines and National Environmental Policy Act Regulations","description":"The National Capital Planning Commission (NCPC) today approved revised Submission Guidelines and National Environmental Policy Act (NEPA) Regulations, and directed staff to work with other agencies to finalize agreed-upon language addressing one issue. These are the primary guidance documents for the Commission\u2019s review of plans and projects, a core agency responsibility. NCPC also heard an update on Smithsonian\u2019s Plans for its Mall South Campus Master Plan.","date":"09\/07\/2017","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/24\/"},{"title":" NCPC Approves Eisenhower Memorial ","description":"At its October 5, 2017 meeting the National Capital Planning Commission (NCPC) gave final approval for the Dwight D. Eisenhower Memorial and the Carnegie Library Renovation plans. NCPC also gave comments on the concept design for a new Central Parking Facility at the National Zoo and heard presentations on the Pennsylvania Avenue Initiative and the National Capital Region Federal Parking Study.","date":"10\/05\/2017","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/25\/"},{"title":"Pennsylvania Avenue Market Analysis and Urban Design Analysis Released","description":"The Pennsylvania Avenue Initiative\u2019s Executive Committee released two studies for Pennsylvania Avenue between the U.S. Capitol and White House. The studies, the Pennsylvania Avenue Market Analysis and the Pennsylvania Avenue Urban Design Analysis, will inform near- and long-term improvements for the Avenue. ","date":"10\/12\/2017","author":"Sarah Ridgely","link":"https:\/\/www.ncpc.gov\/news\/item\/26\/"},{"title":"NCPC Receives Award for Work on Square Guidelines","description":"On October 18, 2017, the Committee of 100 on the Federal City presented a Vision Award to NCPC for the Final Square Guidelines for Squares 378 and 379 (the J. Edgar Hoover Building, FBI Headquarters). Vision Awards recognize work that represents new models for sustainable problem solving and achieving excellence in that endeavor, all within the context of the principles and values emerging from the L\u2019Enfant and McMillan Plans.","date":"10\/20\/2017","author":"Julia Koster","link":"https:\/\/www.ncpc.gov\/news\/item\/27\/"},{"title":"NCPC Provides Feedback on Revised National Air and Space Museum Exterior Improvements ","description":"NCPC Provides Feedback on Revised National Air and Space Museum Exterior Improvements; Commission Also Comments on 11th Street Bridge Park Concept Design. ","date":"11\/02\/2017","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/28\/"},{"title":"NCPC Explores Temporary Commemoration in Philadelphia ","description":"What is an appropriate monument for the current city of Philadelphia? That is the question recently posed by Monument Lab, a public art and history project produced with Mural Arts Philadelphia. On November 3, several NCPC staff spoke to the organizers as part of the agency\u2019s ongoing effort to explore opportunities and challenges associated with new approaches to commemoration.","date":"11\/15\/2017","author":"John Gerbich and Surina Singh","link":"https:\/\/www.ncpc.gov\/news\/item\/29\/"},{"title":"Happy 20th Legacy!","description":"In November 1997, NCPC published Extending the Legacy: Planning America\u2019s Capital for the 21st Century. The Legacy Plan, or Legacy, as it\u2019s affectionately known, is a \u201cbig picture\u201d plan that aims to redefine Washington\u2019s monumental core beyond downtown and the National Mall. In honor of its 20-year anniversary, we take a look at some of the ways the plan has influenced the capital\u2019s development.","date":"11\/22\/2017","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/30\/"},{"title":"Four Goals to Shape Pennsylvania Avenue\u2019s Future","description":"The Pennsylvania Avenue Initiative\u2019s Executive Committee recently established four goals to guide planning and future improvements to Pennsylvania Avenue. These goals will inform the committee\u2019s multi-agency Action Plan, which will identify strategies to increase Pennsylvania Avenue\u2019s daily use while also celebrating its role as a national symbol. ","date":"12\/01\/2017","author":"Sarah Ridgely","link":"https:\/\/www.ncpc.gov\/news\/item\/31\/"},{"title":"NCPC Provides Comments on Potential Sites for the National Desert Storm War Memorial","description":"The National Desert Storm and Desert Shield War Memorial will honor those who served on active duty as members of the Armed Forces in support of Operation Desert Storm and Operation Desert Shield, an international effort led by the United States to liberate Kuwait. The National Capital Planning Commission (NCPC) provided comments to the National Park Service,","date":"12\/08\/2017","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/32\/"},{"title":"National Capital Region Federal Parking Study Released","description":"In October 2017, the Commission accepted a parking study that will inform its future transportation policies and could shape federal facility development and regional transportation patterns. The full study is available online, but for a quick overview, the study\u2019s three key components are outlined below. ","date":"12\/19\/2017","author":"Kael Anderson","link":"https:\/\/www.ncpc.gov\/news\/item\/33\/"},{"title":"NCPC Provides Initial Feedback on South Mall Campus Master Plan Alternatives","description":"At their January 4, 2018 meeting, the National Capital Planning Commission provided initial feedback on South Mall Campus Master Plan alternatives, and on the Joint Base Andrews Master Plan. ","date":"01\/04\/2018","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/35\/"},{"title":"NCPC Updates Regulations","description":"NCPC recently updated three of our regulations in response to changes to the federal code and to reflect important values embraced by our government. The revised regulations, the Freedom of Information Act, the Privacy Act, and National Environmental Policy Act, help us comply with federal law and improve operational efficiency and effectiveness.","date":"01\/11\/2018","author":"Steve Morgan","link":"https:\/\/www.ncpc.gov\/news\/item\/34\/"},{"title":"Now Available: Comprehensive Flood Risk Management Resources Guide","description":"Washington\u2014The National Capital Planning Commission (NCPC) and the interagency DC Silver Jackets team jointly released today the Flood Risk Management Planning Resources for Washington, D.C., with the intent of helping federal and local government planners and facility managers better understand the different flood risk planning resources available to make targeted, informed decisions when developing projects or protecting assets. ","date":"01\/26\/2018","author":"NCPC and DC Silver Jackets","link":"https:\/\/www.ncpc.gov\/news\/item\/36\/"},{"title":"Smart Cities and NCPC","description":"How can we incorporate smart city technologies in to our work? At the January 2018 Commission meeting, Architect and Urban Planner Ken Walton described some of the agency\u2019s recent efforts on smart cities. Here he highlights some of that work, which includes an ongoing effort to turn Pennsylvania Avenue west of the White House into a smart and connected corridor.","date":"01\/30\/2018","author":"Ken Walton","link":"https:\/\/www.ncpc.gov\/news\/item\/37\/"},{"title":"NCPC Hears Update on National Institute of Standards and Technology Master Plan","description":"At their February 1, 2018 meeting, the National Capital Planning Commission heard five information presentations. They included updates on the Purple Line, NIST Campus Master Plan, NCPC's review authority at the Foreign Missions Center, the Comprehensive Plan, and a newly released document on flood risk management resources.","date":"02\/01\/2018","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/38\/"},{"title":"Understanding the New Flood Risk Guide","description":"On January 26, NCPC and the DC Silver Jackets released the \u201cFlood Risk Management Planning Resources for Washington, DC.\u201d Urban Planner Nick Bonard describes why it is so important for facility managers, planners, and designers in the region to consider flood risk in their work and how this new document can help.","date":"02\/13\/2018","author":"Nick Bonard","link":"https:\/\/www.ncpc.gov\/news\/item\/39\/"},{"title":"NCPC Releases Draft Federal Parks & Open Space Element for Public Comment","description":"At its Thursday, March 1 meeting the National Capital Planning Commission (NCPC) authorized release of draft policies for the Parks & Open Space Element Update of the Comprehensive Plan for the National Capital for a public review and comment period that will extend through May 11. ","date":"03\/02\/2018","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/40\/"},{"title":"South Capitol Street\u2019s Future Grounded in NCPC\u2019s Planning Past","description":"This April the Commission will review the final plan for a new Frederick Douglass Memorial Bridge and early concept designs for the bridge gateways that will frame the South Capitol Street Corridor. NCPC staffer Stephen Staudigl describes how previous planning efforts set the stage for South Capitol Street\u2019s transformation.","date":"03\/16\/2018","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/41\/"},{"title":"Adapting Designed Landscapes ","description":"On March 1, 2018, the National Capital Planning Commission (NCPC) released a draft of the federal Parks & Open Space Element for public review and comment through May 7, 2018. Three emerging issues influenced the update of this section of the Comprehensive Plan for the National Capital: adapting designed landscapes, balancing commemorative works within parks, and protecting Capper-Cramton parks. This post is the first in a three part blog series highlighting these topics. ","date":"04\/02\/2018","author":"Surina Singh","link":"https:\/\/www.ncpc.gov\/news\/item\/42\/"},{"title":"NCPC Provides Feedback on the Smithsonian\u2019s South Mall Campus Master Plan","description":"At its Thursday, April 5 meeting, the National Capital Planning Commission (NCPC) provided comments on the Smithsonian Institution\u2019s draft master plan for its 17-acre South Mall Campus that stretches from the Freer Gallery of Art to the Hirshhorn Museum and Sculpture Garden. The plan will guide short- and long-term development at the site over the next 20-30 years and identifies projects to improve visitor services and address long-term space requirements as well as physical and operational deficiencies.","date":"04\/06\/2018","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/43\/"},{"title":"Balancing Commemorative Works within Parks ","description":"On March 1, 2018, the National Capital Planning Commission (NCPC) released the draft Parks & Open Space Element for public review and comment through May 7, 2018. Three emerging issues influenced the element\u2019s update: adapting designed landscapes, balancing commemorative works within parks, and protecting Capper-Cramton parks. This post is the second in a three-part series highlighting these topics.\r\n","date":"04\/19\/2018","author":"Surina Singh","link":"https:\/\/www.ncpc.gov\/news\/item\/44\/"},{"title":"Protecting Capper-Cramton Parks","description":"What do the George Washington Memorial Parkway, Sligo Creek, and Anacostia Park have in common? The federal government, through the Capper-Cramton Act, acquired them, along with many of the region\u2019s parks. This post highlights the creation of Capper-Cramton parks and describes how policy updates in the draft Parks & Open Space Element guide NCPC\u2019s review of proposed projects within them. On March 1, 2018, NCPC released the Parks & Open Space Element draft for public review and comment through May 7, 2018. ","date":"05\/02\/2018","author":"Surina Singh","link":"https:\/\/www.ncpc.gov\/news\/item\/45\/"},{"title":"NCPC Briefed on Pennsylvania Avenue Initiative ","description":"NCPC Briefed on Pennsylvania Avenue Initiative; Streetscape Manual Update and District's Smart Lighting Project also Presented.","date":"05\/03\/2018","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/46\/"},{"title":"Banneker Park Connection Helps NCPC Plans Come to Life","description":"Construction on the Banneker Park connection, which NCPC approved in 2017, is nearing completion. The project provides needed pedestrian and bicycle access improvements between the National Mall, Banneker Park, and The Wharf, a new development on the Southwest Waterfront. It also restores an important historic park and marks the latest example of NCPC plans coming to fruition.","date":"05\/08\/2018","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/47\/"},{"title":"Construction Watch: DC United Stadium","description":"At its February 2, 2017 meeting, NCPC approved preliminary and final site and building plans for a new DC United Stadium located at 100 Potomac Avenue, SW. The soccer-specific stadium, situated on an approximately 8.7 acre site in Buzzard Point, is across 2nd Street, SW from Fort Leslie J. McNair, southwest of the Nationals baseball stadium, and just north of the Anacostia River. Groundbreaking on the 20,000 seat state-of-the-art, LEED-certified stadium took place February 27, 2018. It remains on track to open on Saturday, July 14, 2018.","date":"05\/15\/2018","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/48\/"},{"title":"NCPC Approves Final Smithsonian South Mall Campus Master Plan ","description":"At its Thursday, June 7 meeting the National Capital Planning Commission (NCPC) approved the final master plan for the Smithsonian Institution\u2019s 17-acre South Mall Campus that stretches from the Freer Gallery of Art to the Hirshhorn Museum and Sculpture Garden. In its approval NCPC found that the master plan will increase campus functionality, improve the visitor experience, and enhance connectivity both within the site and to the surrounding city and neighborhoods, while balancing planning, urban design, and historic preservation goals. ","date":"06\/07\/2018","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/49\/"},{"title":"The International Chancery Center \u2013 the First Foreign Mission Enclave","description":"The U.S. Department of State is preparing a master plan for the Foreign Missions Center (FMC) on a 32-acre portion of the former Walter Reed Army Medical Center in Northwest, Washington, DC. It will be an enclave of 11-15 embassies, but it is not the first foreign mission enclave in the capital. That distinction belongs to the International Chancery Center (ICC). This post will describe how the ICC came about and why it is a successful way to host foreign missions in the city.","date":"06\/25\/2018","author":"Nicholas Bonard","link":"https:\/\/www.ncpc.gov\/news\/item\/50\/"},{"title":"NCPC Postpones Action on National Zoo Fencing Proposal","description":"Influenced by the public comments it received about the project, the National Capital Planning Commission (NCPC) postponed taking action on preliminary and final site development plans submitted by the Smithsonian Institution for supplemental perimeter fencing at the National Zoological Park in Northwest Washington, DC. NCPC requested that the Smithsonian provide a brief security assessment and conduct public outreach and meetings with members of the community and other stakeholders to explain their proposed plans prior to NCPC\u2019s next monthly meeting in September. NCPC received more than 250 comments.","date":"07\/12\/2018","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/51\/"},{"title":"Why are There so Many Brutalist Federal Buildings in Washington?","description":"Walking around Washington, DC, you might notice several large federal buildings made of concrete with little to no ornamentation. These buildings belong to an architectural style known as Brutalism, which employs concrete massing as functional design. This post will highlight some buildings that fit within the style and explore why there are so many Brutalist federal buildings in the National Capital Region.","date":"07\/25\/2018","author":"Dana Marks*","link":"https:\/\/www.ncpc.gov\/news\/item\/52\/"},{"title":"Washington\u2019s Streetlights: Illuminating the Capital City One Road at a Time","description":"While their primary objective is to provide light to pedestrians and motorists at night, streetlights are also an important element of the urban fabric and often contribute to the historical significance of specific neighborhoods. Today, there are more than 70,000 streetlights in a variety of styles and dimensions throughout Washington, DC. What style to use on each street is often determined by the street\u2019s classification and historic district designation. Here we will explore the design of some of Washington\u2019s iconic streetlight fixtures, and where to find them in the city.","date":"08\/17\/2018","author":"Dana Marks*","link":"https:\/\/www.ncpc.gov\/news\/item\/53\/"},{"title":"Construction Watch: the REACH at the Kennedy Center","description":"NCPC approved final site and building plans for expansion of the John F. Kennedy Memorial and Performing Arts Center on July 9, 2015. The Commission approved the related Kennedy Center Expansion Connection project\u2014a pedestrian ramp and bridge over Rock Creek Parkway that will connect the Kennedy Center and the expansion project with the Rock Creek Paved Recreation Trail and the Potomac waterfront\u2014on July 7, 2016. These approvals capped a multi-year Commission review process for the first major expansion of the building since it opened in September 1971.","date":"08\/30\/2018","author":"Carlton Hart","link":"https:\/\/www.ncpc.gov\/news\/item\/55\/"},{"title":"NCPC Postpones National Zoo Perimeter Fence Review","description":"At its September 6 meeting, the National Capital Planning Commission (NCPC) voted to postpone review of supplemental perimeter fencing at the National Zoo until a later date, per the Smithsonian Institution\u2019s request. The Smithsonian seeks more time to address both Commission and public comments and questions. They anticipate submitting updated plans for NCPC review later this fall.","date":"09\/06\/2018","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/56\/"},{"title":"DC Embraces Augmented Reality to Plan Its Future","description":"Imagine touring Washington, DC, with an interactive virtual guide that shares fascinating historical details about buildings and monuments. You could listen to stories about people and events by simply pointing your device toward something to access relevant information. This scenario explains the capabilities of augmented reality (AR), a technology the National Capital Planning Commission\u2019s (NCPC) Policy and Research Division staff is exploring to both improve visitor experiences and analyze planning projects.","date":"09\/17\/2018","author":"Brooks Patrick","link":"https:\/\/www.ncpc.gov\/news\/item\/57\/"},{"title":"Federal Ownership of Washington, DC Shorelines ","description":"The federal government owns approximately 85% of the shorelines in Washington, DC. The National Park Service administers and manages the vast majority of the federally owned shoreline.","date":"09\/24\/2018","author":"Nicholas Bonard","link":"https:\/\/www.ncpc.gov\/news\/item\/54\/"},{"title":"Construction Watch: MLK Library","description":"NCPC approved final site and building plans for the rehabilitation and modernization of the Martin Luther King Jr. Memorial Library on October 6, 2016. The library, located at 901 G Street, NW, is a historic landmark and the work of Ludwig Mies van der Rohe, a recognized master of Modern architecture. The building reflects International Style architecture with its rectangular form, exposed steel structure, and curtain walls of windows.","date":"10\/08\/2018","author":"Jennifer Hirsch","link":"https:\/\/www.ncpc.gov\/news\/item\/58\/"},{"title":"Spectacle! A Closer Look ","description":"NCPC welcomed Helen Marriage on October 16 to discuss her work on the spectacular public art events enlivening cities in the United Kingdom. While much of her work builds on the unique people and places of the UK, her talk inspired many in the audience to think about how Washington\u2019s people and public spaces might reconnect through this approach.","date":"10\/23\/2018","author":"Sarah Ridgely","link":"https:\/\/www.ncpc.gov\/news\/item\/59\/"},{"title":"NCPC Comments on Draft Small Cell Infrastructure Guidelines","description":"At its November 1 meeting, the National Capital Planning Commission (NCPC) authorized comments on draft Small Cell Infrastructure Guidelines submitted by the District Department of Transportation (DDOT). DDOT is the lead agency and liaison with the cellular providers who want to install small cell infrastructure, a new lower-powered antenna technology, on poles along public right of ways. ","date":"11\/02\/2018","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/60\/"},{"title":"Construction Watch: Eisenhower Memorial","description":"On October 5, 2017 NCPC approved revised preliminary and final site and building plans for the Dwight D. Eisenhower Memorial. The memorial groundbreaking was held on November 2, 2017 and construction is now underway, with the opening scheduled for May 8, 2020, the 75th anniversary of Victory in Europe Day. ","date":"11\/14\/2018","author":"Vivian Lee","link":"https:\/\/www.ncpc.gov\/news\/item\/61\/"},{"title":"NCPC Provides Feedback on Draft Small Cell Infrastructure Guidelines ","description":"To meet current and future needs cellular providers want to install small cell infrastructure, a new lower-powered antenna technology, on poles along public right of ways in the nation\u2019s capital. Because small cell antennas have a limited signal range, hundreds of antennas and related equipment would need to be installed throughout the city to meet coverage needs.","date":"11\/21\/2018","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/62\/"},{"title":"Construction Watch: National Law Enforcement Museum","description":"The National Law Enforcement Museum (NLEM) held its grand opening on October 13, 2018, concluding a multiyear review process with the National Capital Planning Commission. The final streetscape components of the NLEM were approved by the Commission at its May 3, 2018 meeting.","date":"12\/04\/2018","author":"John Gerbich","link":"https:\/\/www.ncpc.gov\/news\/item\/63\/"},{"title":"NCPC Comments on Draft Small Cell Infrastructure Guidelines ","description":"The National Capital Planning Commission (NCPC) provided additional comments at its Thursday, December 6 meeting on the small cell guidelines proposed by the District Department of Transportation (DDOT), including a map intended to guide the location of small cell infrastructure in the city\u2019s federal core. ","date":"12\/06\/2018","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/65\/"},{"title":"APA's Newsletter Article: Adapting Designed Landscapes","description":"This article was published in the Fall Newsletter of the American Planning Association\u2019s Urban Design and Preservation Division. The findings were incorporated into NCPC's recently adopted Parks and Open Space element. ","date":"12\/10\/2018","author":"Sarah Ridgely","link":"https:\/\/www.ncpc.gov\/news\/item\/64\/"},{"title":"International Awards Recognize NCPC\u2019s Website","description":"Three prestigious organizations, the National Association of Government Communicators, the Horizon Interactive Awards, and the Davey Awards have honored NCPC for our website redesign work. ","date":"01\/28\/2019","author":"Steve Morgan","link":"https:\/\/www.ncpc.gov\/news\/item\/66\/"},{"title":"NCPC Approves Preliminary Plans for National World War I Memorial ","description":"NCPC approved preliminary site development plans for the National World War I Memorial submitted by the National Park Service in collaboration with the World War I Centennial Commission. The memorial, proposed for downtown Washington\u2019s Pershing Park, will honor the service of members of the United States Armed Forces in World War I. ","date":"02\/08\/2019","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/68\/"},{"title":"What\u2019s changed in the Parks & Open Space Element?","description":"Much has happened since the 2004 update of the Federal Parks & Open Space! On December 6, 2018, the National Capital Planning Commission (NCPC) adopted an updated element that reflects current issues and trends faced by parks and open space in the region and provides new guidance for federal agencies to administer these spaces. ","date":"02\/12\/2019","author":"Surina Singh","link":"https:\/\/www.ncpc.gov\/news\/item\/67\/"},{"title":"Memorials, Infrastructure Projects Highlighted during February\u2019s Commission Meeting","description":"The National World War I Memorial design advanced, and a new memorial honoring Native American Veterans was introduced as part of the February 7 Commission meeting. The Commission provided final approvals for the South Capitol Street Bridge corridor improvements and heard about the status of a high-speed transit line between Washington, DC and Baltimore, MD.","date":"02\/13\/2019","author":"Julia Koster","link":"https:\/\/www.ncpc.gov\/news\/item\/69\/"},{"title":"NCPC Approves Revised National Zoo Perimeter Fence Plans","description":"NCPC approved preliminary and final site development plans submitted by the Smithsonian Institution for supplemental perimeter fencing at the National Zoo, located in Northwest Washington, DC. The project was originally submitted in July 2018, but NCPC postponed action due to outstanding questions from the public and Commission regarding the need for the enhanced security measures. ","date":"03\/08\/2019","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/71\/"},{"title":"Updating the Streetscape Manual","description":"The Monumental Core Streetscape Project is a collaboration between NCPC staff and the Interagency Working Group to update the Streetscape Manual \u2013 a document that guides federal and local city staff involved in the planning and designing of streetscapes in federal interest areas. ","date":"03\/13\/2019","author":"Meghan Spigle Dowker","link":"https:\/\/www.ncpc.gov\/news\/item\/70\/"},{"title":"Commission Approves Revised National Zoo Perimeter Fence Plans ","description":"Back in July 2018, NCPC postponed action on proposed supplemental perimeter fencing at the Smithsonian Institution\u2019s National Zoo due to outstanding questions raised by the public and Commission regarding the need for enhanced security measures. Responding to this feedback, the Smithsonian made major changes to the submission, including eliminating permanent security screening pavilions from further consideration. ","date":"03\/26\/2019","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/72\/"},{"title":"Construction Watch: Washington Monument Visitor Screening Facility","description":"NCPC approved final site and building plans for a new visitor\u2019s screening facility at the Washington Monument on February 2, 2017. The project\u2019s goal is to replace the existing temporary facility and accommodate aesthetic and historic preservation concerns at this prominent location.","date":"03\/28\/2019","author":"Carlton Hart","link":"https:\/\/www.ncpc.gov\/news\/item\/73\/"},{"title":"NCPC Approves Final Plans for Franklin Park Rehab and Convention Center Exterior Alterations","description":"NCPC approved final site and building plans for rehabilitation of the National Register of Historic Places-listed Franklin Park, located in downtown. In its approval, NCPC noted that the design changes to the caf\u00e9 and children\u2019s garden address previous Commission comments and that both features will benefit park users. They also commended the new public-private partnership that will revitalize the park and manage it going forward, noting that this new model will be a blueprint for other federal parks in the city.","date":"04\/05\/2019","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/74\/"},{"title":"Construction Watch: National Air and Space Museum","description":"Representatives from Smithsonian, the U.S. Commission of Fine Arts, and NCPC reviewed an aesthetic and performance mockup at a testing facility in York, Pennsylvania on November 27, 2018. ","date":"04\/09\/2019","author":"Vivian Lee","link":"https:\/\/www.ncpc.gov\/news\/item\/75\/"},{"title":"New Infrastructure for Washington, DC\u2019s Wireless Network","description":"Demand for wireless technology and improved connectivity continues to increase across the country, and within the National Capital Region. The increasing number of wireless devices and higher data demands all impact the wireless infrastructure which we take for granted. To reduce congestion on the network, cellular providers continue to explore ways to improve capacity and speed. ","date":"04\/11\/2019","author":"Matthew Flis","link":"https:\/\/www.ncpc.gov\/news\/item\/76\/"},{"title":"Construction Watch: 10th Street, SW","description":"Activity is abuzz in the 10th Street, SW corridor as several projects near the SW Ecodistrict\u2019s central spine either recently opened or are near completion.","date":"04\/18\/2019","author":"Stephen Satudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/77\/"},{"title":"Public Spaces Reimagined: April Meeting Recap","description":"NCPC\u2019s April meeting spotlighted efforts to re-imagine several public spaces and places across Washington that will add new features to the city\u2019s fabric. Read on to learn how these projects downtown, on the National Mall, and elsewhere will impact the city.","date":"04\/19\/2019","author":"Julia Koster","link":"https:\/\/www.ncpc.gov\/news\/item\/78\/"},{"title":"NCPC Provides Feedback on Peace Corps Commemorative Work Design","description":"At its Thursday, May 2 meeting, the National Capital Planning Commission (NCPC) commented on a concept design for the proposed Peace Corps Commemorative Work submitted by the National Park Service in collaboration with the Peace Corps Commemoration Foundation. ","date":"05\/03\/2019","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/79\/"},{"title":"Construction Watch: Carnegie Library ","description":"After 20 months of construction, the historic Carnegie Library will reopen on May 11 as a new flagship Apple store and home of the Historical Society of Washington. The store, with retail, event, and education components, will occupy the first floor and part of the basement. The Historical Society, including its Kiplinger Research Library, exhibitions, and administrative offices, will occupy the second floor.","date":"05\/07\/2019","author":"Lee Webb","link":"https:\/\/www.ncpc.gov\/news\/item\/80\/"},{"title":"Kennedy Center Bridge Connection","description":"An important bike\/pedestrian bridge connection to the Kennedy Center was installed over Rock Creek Parkway early this May. A crain lowered the critical spans on May 11.","date":"05\/16\/2019","author":"Julia Koster","link":"https:\/\/www.ncpc.gov\/news\/item\/82\/"},{"title":"The Importance of Concept Review","description":"NCPC\u2019s review process typically consists of three phases concept, preliminary, and final. While final concludes the process, concept is sometimes the most important. This is the time when Commissioners provide input into the range of project alternatives considered, and the general consistency of the alternatives with NCPC policies.","date":"05\/16\/2019","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/81\/"},{"title":"NCPC Provides Feedback on Georgetown Canal Plan and Hirshhorn Museum Sculpture Garden Revitalization","description":"At its Thursday, June 6 meeting the National Capital Planning Commission (NCPC) provided feedback to the National Park Service (NPS) on the Georgetown Canal Plan. The plan, developed by NPS in cooperation with the Georgetown Business Improvement District, Georgetown Heritage, and District of Columbia Office of Planning, would enhance a one-mile stretch of the C&O Canal from the zero-mile marker at 28th Street, NW to the Alexandria Aqueduct located at 36th Street, NW. The 184.5-mile long canal, constructed from 1828-1831, is on the National Register of Historic Places.","date":"06\/07\/2019","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/84\/"},{"title":"Construction Watch: National Museum of the U.S. Army","description":"The United States Department of the Army is constructing the National Museum of the United States Army on Fort Belvoir\u2019s North Post, situated about a mile to the east of I-95 in Fairfax County, Virginia. ","date":"06\/11\/2019","author":"Michael Weil","link":"https:\/\/www.ncpc.gov\/news\/item\/83\/"},{"title":"NCPC Provides Input on Georgetown Canal Plan and Hirshhorn Museum Sculpture Garden Revitalization","description":"At its Thursday, June 6 meeting NCPC provided feedback to the National Park Service (NPS) on the \r\nGeorgetown Canal Plan. ","date":"06\/20\/2019","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/85\/"},{"title":"A Living Memorial to President Kennedy","description":"Many people know of the John F. Kennedy Center for the Performing Arts as a world class performance venue, but how many realize that it is also the living memorial to President John F. Kennedy? The Kennedy Center seeks to further its role as a timeless living memorial to President Kennedy that provides a gathering place for people to visit, dwell, learn, and be inspired by his ideals.","date":"07\/10\/2019","author":"Kenneth Walton","link":"https:\/\/www.ncpc.gov\/news\/item\/86\/"},{"title":"NCPC Authorizes Release of Draft Federal Workplace Element for a 60-Day Public Comment Period","description":"At its July 11 meeting, the National Capital Planning Commission (NCPC) authorized release of an update to the Comprehensive Plan\u2019s Federal Workplace Element for a 60-day public comment period. ","date":"07\/12\/2019","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/87\/"},{"title":"Adapting to the Changing Needs of the Federal Workplace","description":"On July 11, 2019, the National Capital Planning Commission (NCPC) released a draft of the Comprehensive Plan for the National Capital\u2019s Federal Workplace Element for public review and comment through September 16, 2019. Four emerging issues influenced the update of this element: adapting to the changing needs of the workplace; locating federal workplaces strategically, designing sustainable and healthy workplaces; and integrating federal facilities with their surrounding communities. ","date":"07\/30\/2019","author":"Angela Dupont","link":"https:\/\/www.ncpc.gov\/news\/item\/90\/"},{"title":"Honoring Apollo 11 On The National Mall","description":"On July 20, 1969, an estimated 650 million people watched Neil Armstrong\u2019s televised image and heard his voice describe the event as he took \u201c\u2026one small step for a man, one giant leap for mankind.\u201d Fifty years later, we gathered over several hot July evenings to commemorate the Apollo 11 mission.","date":"07\/31\/2019","author":"Angela Dupont","link":"https:\/\/www.ncpc.gov\/news\/item\/91\/"},{"title":"What's in a Logo?","description":"2019 marks the tenth anniversary of the National Capital Planning Commission\u2019s current logo. In early 2009 I, the agency\u2019s graphic artist, was tasked to redesign the logo. At the time, NCPC did not have a strong public identity or brand. Experts say that a successful logo creates a recognizable and memorable image that effectively communicates an organization\u2019s mission and activities, and the existing logo did not do this.","date":"08\/01\/2019","author":"Paul Jutton","link":"https:\/\/www.ncpc.gov\/news\/item\/88\/"},{"title":"The REACH Grand Opening","description":"As the Kennedy Center prepares to celebrate the grand opening of the REACH on September 7, NCPC extends its congratulations to Executive Director Deborah Rutter and the amazing team whose vision, creativity, and hard work produced this exciting new space for Washington, DC and the nation. ","date":"09\/03\/2019","author":"Julia Koster","link":"https:\/\/www.ncpc.gov\/news\/item\/92\/"},{"title":"NCPC Authorizes Release of the Draft Transportation Element for Public Comment","description":"At its September 5 meeting the National Capital Planning Commission (NCPC) authorized release of an update to the Comprehensive Plan\u2019s Transportation Element and Submission Guidelines for a 60-day public comment period. ","date":"09\/09\/2019","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/93\/"},{"title":"The Highway Plan: Washington\u2019s Little-Known Planning Document","description":"Many people are familiar with the historic L\u2019Enfant Plan\u2014a plan for Washington\u2019s development, and one of the most unique master plans in the United States\u2014and the McMillan Plan that formalized the National Mall's design. However, there is another unique plan that greatly influenced the development of Washington, DC.","date":"10\/01\/2019","author":"Adam Gordon","link":"https:\/\/www.ncpc.gov\/news\/item\/89\/"},{"title":"NCPC Approves Final Plans for the National World War I Memorial","description":"At its October 3 meeting the National Capital Planning Commission (NCPC) approved final site development plans submitted by the National Park Service in collaboration with the World War I Centennial Commission for the National World War I Memorial. The memorial will be located in downtown Washington, DC\u2019s Pershing Park and honor the service of members of the United States Armed Forces during World War I. ","date":"10\/04\/2019","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/94\/"},{"title":"Open to the Public: Rethinking Security & Access in Public Space","description":"As planners and designers, our responsibility is to ensure the health, safety, and welfare of all\u2014but how do we keep people safe in these public spaces while ensuring they remain active social spaces that foster civic engagement and openness? This question was the central discussion point for our expert panel that represented the perspectives of urban planners, first responders, and landscape architects.","date":"10\/09\/2019","author":"Surina Singh","link":"https:\/\/www.ncpc.gov\/news\/item\/95\/"},{"title":"The Federal Transportation Element Update: Four Guiding Principles","description":"While the draft element discusses regional issues at large, it is primarily tasked with providing policies and a vision to address federal transportation needs. This includes how federal employees travel to and from work, federal campus design and circulation, integrating transportation networks, new technologies, and of course, parking. ","date":"10\/11\/2019","author":"Johanna McCrehan","link":"https:\/\/www.ncpc.gov\/news\/item\/96\/"},{"title":"October 2019 Commission Meeting Recap","description":"NCPC completed its final review of the World War I Memorial, which will be located in Pershing Park between 14th and 15th Streets, NW along Pennsylvania Avenue. The memorial includes a freestanding wall with the bas-relief sculpture illustrating the war experience on the east side, and an inscription devoted to peace on the west side of the wall. The design now includes a new belvedere\/viewing platform to visually link the existing General Pershing memorial on the southeast side with the new commemorative wall that conveys the \u2018every man\u2019 experience of those serving and impacted by the war.","date":"10\/17\/2019","author":"Julia Koster","link":"https:\/\/www.ncpc.gov\/news\/item\/97\/"},{"title":"NCPC Comments on DHS Headquarters Master Plan Amendment","description":"At its November 7 meeting the National Capital Planning Commission (NCPC) provided feedback to the General Services Administration on the proposed Master Plan Amendment for the Department of Homeland Security (DHS) Headquarters Consolidation at the 176-acre St. Elizabeths West Campus in Southeast Washington, DC. The amendment would adjust the master plan previously approved in 2009 to address new DHS programming requirements and budget constraints. ","date":"11\/08\/2019","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/98\/"},{"title":"Planning for the Future of the Region\u2019s Economy","description":"The draft Federal Workplace Element talks about how federal workplaces are evolving, which poses many important implications for the future of communities and the region\u2013specifically to development patterns and the regional economy. The federal government has long been the National Capital Region\u2019s largest employer, property owner, and contributor to the region\u2019s economic health. However, the region\u2019s economy is rapidly diversifying, and tech companies like Amazon are propelling changes. Despite these changes federal facilities and installations remain important parts of their communities.","date":"11\/20\/2019","author":"Angela Dupont","link":"https:\/\/www.ncpc.gov\/news\/item\/99\/"},{"title":"NCPC Provides Comments on Federal Reserve Board Building Project","description":"At its December 5 meeting the National Capital Planning Commission (NCPC) provided feedback to the Board of Governors of the Federal Reserve System on their plans to renovate and expand the Marriner S. Eccles Building (the Board\u2019s headquarters, constructed between 1935-1937) and renovate and construct an addition to the Federal Reserve Board-East Building (constructed between 1931-1933 for the U.S. Public Health Service) located on Constitution Avenue, NW. ","date":"12\/06\/2019","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/101\/"},{"title":"Construction Watch: Arlington Memorial Bridge Rehabilitation ","description":"The Commission previously approved the preliminary and final site development plans for the project in June 2018. The effort includes the replacement of the steel bascule span; repairs to the deteriorated portions of the abutments, piers, and concrete arch approach spans; replacement of the concrete bridge deck; resurfacing of the travel lanes; replacement of the concrete sidewalks and refitting of granite curbs; repairs to granite bridge railings; and other improvements.","date":"12\/17\/2019","author":"Matthew Flis","link":"https:\/\/www.ncpc.gov\/news\/item\/100\/"},{"title":"The End of an Era","description":"At its December 5, 2019 meeting, the National Capital Planning Commission approved a request submitted by the District of Columbia Office of Planning (DCOP), on behalf of the Mayor, to close out urban renewal plans for downtown and the Shaw neighborhood. ","date":"12\/26\/2019","author":"Anne Schuyler","link":"https:\/\/www.ncpc.gov\/news\/item\/102\/"},{"title":"NCPC Provides Comments on the National Desert Storm and Desert Shield Memorial","description":"At its Thursday, January 9 meeting, the National Capital Planning Commission (NCPC) provided comments on concept plans for the National Desert Storm and Desert Shield Memorial to the National Park Service, which submitted the project in collaboration with the National Desert Storm War Memorial Association. The refined design concept is for a site on the southwest corner of 23rd Street and Constitution Avenue, NW. ","date":"01\/10\/2020","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/104\/"},{"title":"Streetscape Framework and Lighting Policy","description":"NCPC and the National Mall Roads Interagency Working Group are collaborating to update the National Mall Streetscape Manual. The Streetscape Framework and Lighting Policy comprise the first task out of three in updating the Streetscape Manual. Once complete, the manual will be a user-friendly resource and tool that federal and local staff can use to plan and design streetscapes in the capital's monumental core.","date":"01\/13\/2020","author":"Meghan Spigle Dowker","link":"https:\/\/www.ncpc.gov\/news\/item\/103\/"},{"title":"Resource Guides Explain Review Authorities and Responsibilities","description":"NCPC reviews federal projects on federal land. It would not be a surprise, then, to learn that many of the agency\u2019s authorities to review these development projects and master plans stem from the National Capital Planning Act, passed by Congress in 1954.","date":"02\/05\/2020","author":"Julia Koster and Diane Sullivan","link":"https:\/\/www.ncpc.gov\/news\/item\/105\/"},{"title":"NCPC Defers Action on National Institutes of Health Master Plan Amendment","description":"At its Thursday, February 6 meeting , the National Capital Planning Commission (NCPC) deferred action on a submission by the U.S. Department of Health and Human Services for an amendment to the 2013 National Institutes of Health (NIH) master plan. ","date":"02\/07\/2020","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/106\/"},{"title":"NCPC Provides Input on Concept Plans for National Park Service Reservation 378 Park Reconstruction","description":"At its meeting on Thursday, March 5 the National Capital Planning Commission (NCPC) provided comments on concept plans submitted by the National Park Service, in coordination with the Federal Reserve Board, for design revisions and reconstruction of the park at National Park Service Reservation 378, located on Virginia Avenue, NW between C and 21st Streets, NW, ","date":"03\/06\/2020","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/107\/"},{"title":"Digital Submissions Now Available","description":"Each month, agencies across the National Capital Region submit projects and materials to NCPC for review. Historically, agencies submitted paper or CD copies by mail, courier, or drop-off. However, they can now submit materials digitally. Digital submissions allowed us to automate the process, saving time, materials, and money and making it more efficient for both applicants and NCPC staff.","date":"03\/16\/2020","author":"Steve Morgan","link":"https:\/\/www.ncpc.gov\/news\/item\/108\/"},{"title":"NCPC Approves Consent Calendar by Notational Vote","description":"While there was no April 2, 2020 National Capital Planning Commission (NCPC) meeting due to the COVID-19 guidance on gatherings, Commissioners did vote by email to approve the Consent Calendar items listed below and a proposed by-law amendment to expressly allow online Commission meetings. While NCPC\u2019s office is closed, the agency is open for business through online services, including digital project submissions.","date":"04\/06\/2020","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/109\/"},{"title":"Resource Guide: Capper-Cramton Act","description":"Continuing our series on NCPC\u2019s resource guides, we now look at the one focused on the Capper-Cramton Act. As a reminder, there are many regulations and policies that staff and Commissioners use when reviewing projects submitted by local and federal agencies that are in the National Capital Region. ","date":"04\/10\/2020","author":"Steve Morgan","link":"https:\/\/www.ncpc.gov\/news\/item\/110\/"},{"title":"NCPC Holds Online Special Meeting to Hear Update on Antenna Guidelines","description":"In response to the CDC\u2019s COVID-19 guidance on gatherings, on Wednesday, April 29 the National Capital Planning Commission (NCPC) held its first ever online meeting to test digital technology in preparation to conduct its regularly scheduled Thursday, May 7, 2020 meeting online. ","date":"04\/30\/2020","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/111\/"},{"title":"NCPC Approves Final Plans for Korean War Veterans Memorial Wall of Remembrance","description":"At its Thursday, May 7 meeting, held online due to COVID-19 guidance on gatherings, the National Capital Planning Commission (NCPC) approved preliminary and final site and building plans for the Modification of a General Development Plan for the Meadowbrook Stables Riding Ring Pavilion. ","date":"05\/08\/2020","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/112\/"},{"title":"Construction Watch: New Frederick Douglass Memorial Bridge","description":"The new Frederick Douglass Memorial Bridge is currently under construction, with two of its three arches completed, and is expected to open in 2021. The District Department of Transportation is overseeing the project, for which the National Capital Planning Commission approved final plans in April 2018. ","date":"05\/14\/2020","author":"Matthew Flis","link":"https:\/\/www.ncpc.gov\/news\/item\/113\/"},{"title":"NCPC Approves Final Master Plan for the Smithsonian\u2019s Suitland Collections Center","description":"At its June 4 meeting, the National Capital Planning Commission (NCPC) approved the final master plan for the Smithsonian Institution\u2019s Suitland Collections Center located in Suitland, Maryland. Since the 1950\u2019s the center has been one of the Smithsonian\u2019s primary locations to store collections not on display in its museums. ","date":"06\/05\/2020","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/114\/"},{"title":"Lessons Learned from Meeting Online","description":"What a different world we\u2019re living in. With many of us holding online office meetings we\u2019re thinking about things that weren\u2019t on anyone\u2019s mind in January, such as how does my quarantine hair look? There are other considerations. Government agencies, like the National Capital Planning Commission (NCPC), still have responsibilities to hold formal public meetings so the entitlement process can move forward.","date":"06\/10\/2020","author":"Marcel Acosta","link":"https:\/\/www.ncpc.gov\/news\/item\/115\/"},{"title":"NCPC Adopts Comprehensive Plan\u2019s Transportation Element ","description":"At its July 9 meeting, the National Capital Planning Commission (NCPC) commented favorably on the proposed second Master Plan Amendment for the Department of Homeland Security (DHS) Headquarters Consolidation submitted by the General Services Administration for the 176-acre St. Elizabeths West Campus in Southeast Washington, DC. ","date":"07\/14\/2020","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/117\/"},{"title":"Updating NCPC's Tree Replacement Policy","description":"Trees are a valuable resource for a variety of reasons. Their benefits range from environmental to visual, and at the end of the day no one ever says, \u201cI wish we had less trees.\u201d So why does it seem that trees are so easily removed when a new development is built? ","date":"07\/20\/2020","author":"Stephanie Free","link":"https:\/\/www.ncpc.gov\/news\/item\/116\/"},{"title":"Memorandum of Understanding Signed for Armed Forces Retirement Home Redevelopment","description":"On July 28, 2020, representatives from the National Capital Planning Commission (NCPC), DC Office of Planning (DCOP), and the Armed Forces Retirement Home (AFRH) signed a Memorandum of Understanding (MOU) that identifies the process for redevelopment of an underutilized 80-acre parcel of land (Zone A) on the AFRH campus by a private developer.","date":"08\/19\/2020","author":"Stephen Staudigl, Mekdy Alemayehu, and Christopher Kelly","link":"https:\/\/www.ncpc.gov\/news\/item\/118\/"},{"title":"Antennas, Antennas Everywhere","description":"What were you doing in 2001? Back then, the last time NCPC updated its antenna submission guidelines, the United States had 109 million mobile phones. Today, there are more than 300 million in use. The proliferation and use of smart phones, tablets and GPS devices have increased the demand for cellular antennas.","date":"09\/02\/2020","author":"Carlton Hart","link":"https:\/\/www.ncpc.gov\/news\/item\/119\/"},{"title":"NCPC Approves National Institutes of Health Master Plan Amendment","description":"At its September 3 online meeting, the National Capital Planning Commission (NCPC) approved an amendment to the final master plan for the 310-acre National Institutes of Health (NIH) campus located in Bethesda, Maryland. The amendment allows two new projects to be added to the plan previously approved by NCPC in 2016: a connected parking garage\/utility vault (also reviewed today) and an addition to the Clinical Center Complex (which NCPC will review in the future).","date":"09\/04\/2020","author":"Stephen Staudugl","link":"https:\/\/www.ncpc.gov\/news\/item\/120\/"},{"title":"NCPC Approves Preliminary Federal Reserve Expansion Plans","description":"At its October 1 online meeting, the National Capital Planning Commission (NCPC) approved preliminary site and building plans for a project on the Federal Reserve campus submitted by the Board of Governors of the Federal Reserve System. Plans call for the renovation and expansion of the Marriner S. Eccles Building located at 2051 Constitution Avenue, NW and the renovation of, and addition to, the Federal Reserve Board-East Building located at 1951 Constitution Avenue NW. The Eccles Building is the Board\u2019s headquarters.","date":"10\/02\/2020","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/121\/"},{"title":"Incorporating Public Feedback into NCPC\u2019s Draft Tree Preservation and Replacement Policies","description":"On July 9, NCPC initiated a 60-day public comment period on proposed draft updates to its Tree Preservation and Replacement policies and Submission Guidelines. The draft policies propose to strengthen tree preservation guidelines, clarify replacement quantities and standards, and provide alternatives in cases when these standards can\u2019t be met. ","date":"10\/16\/2020","author":"Stephanie Free","link":"https:\/\/www.ncpc.gov\/news\/item\/122\/"},{"title":"It\u2019s Only Just Begun: NCPC to Review First Foreign Missions Center Chancery Application","description":"At its November meeting, the National Capital Planning Commission (NCPC) will review its first application for development at the Foreign Missions Center (FMC). The FMC, which is the second foreign mission enclave in the capital after the International Chancery Center, consists of approximately 30-acres of federally-owned land located at the site of the former Walter Reed National Military Medical Center in Washington, DC. The Department of State\/Office of Foreign Missions (OFM) intends to develop the FMC as individual chancery sites leased to foreign governments. ","date":"10\/21\/2020","author":"Anne Schuyler","link":"https:\/\/www.ncpc.gov\/news\/item\/123\/"},{"title":"NCPC Approves Final Plans for Arlington National Cemetery\u2019s Southern Expansion","description":"At its November 5 online meeting, the National Capital Planning Commission (NCPC) approved, with one exception, preliminary and final site and building plans submitted by the U.S. Army Corps of Engineers, in conjunction with Arlington National Cemetery, for the cemetery\u2019s Southern Expansion project. The project will expand the cemetery to the south by 70 acres and incorporate the U.S. Air Force Memorial into its secure grounds. This south parcel formerly housed the Navy Annex Buildings and their parking lots.","date":"11\/06\/2020","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/124\/"},{"title":"New Efforts to Monitor Progress towards Federal Transportation Goals","description":"The National Capital Region faces significant transportation challenges, which impact where people live and work, development patterns, environmental conditions, and quality of life. NCPC is launching a new monitoring program to help federal agencies addres these challenges and promote more efficient and sustainable travel to federal destinations. ","date":"11\/18\/2020","author":"Steve Morgan","link":"https:\/\/www.ncpc.gov\/news\/item\/125\/"},{"title":" NCPC Advances Plans, Requests Additional Information, for Hirshhorn Sculpture Garden Revitalization","description":"At its Thursday, December 3 meeting, the National Capital Planning Commission (NCPC) approved preliminary site development plans, with the exception of proposed changes to the garden\u2019s reflecting pool and inner partition wall, submitted by the Smithsonian Institution to revitalize the Hirshhorn Museum\u2019s Sculpture Garden. ","date":"12\/04\/2020","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/126\/"},{"title":"Resource Guide: Stormwater Management","description":"NCPC developed several resource guides to help applicants better understand the various authorities the Commission uses to review projects related to historic preservation, memorial site selection, certain airport and transit facilities, and more. This blog presents an overview of the resource guide on stormwater management.","date":"12\/11\/2020","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/127\/"},{"title":"Tidal Basin Ideas Lab \u2013 A Call to Action","description":"The National Mall Tidal Basin is an extraordinary public space that plays an important role in crafting the collective memory and legacy of United States history. This place is home to iconic landmarks and traditions in the nation\u2019s capital, including memorials to Thomas Jefferson, Franklin Delano Roosevelt, George Mason, and Martin Luther King, Jr., as well as the beloved cherry trees. ","date":"12\/16\/2020","author":"Teresa Durkin ","link":"https:\/\/www.ncpc.gov\/news\/item\/128\/"},{"title":"Commission Updated on Status of Monumental Core Streetscape Design Guidelines","description":"At its Thursday, January 7, 2021 meeting, NCPC staff provided the Commission with an update on development of Streetscape Design Guidelines for Washington\u2019s monumental core. Developed by an Interagency Working Group consisting of representatives from 11 federal and local stakeholder agencies, the guidelines will assist in the future development of streetscapes in downtown\u2019s monumental core, in and within the vicinity of the National Mall and other important federal locations. ","date":"01\/08\/2021","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/130\/"},{"title":"Paul Dans Named National Capital Planning Commission Chairman","description":"Paul Dans was named as the new Chairman of the National Capital Planning Commission (NCPC) for a six-year term that extends to January 1, 2027. He serves as the Presidential appointee representing the state of Maryland. His background includes two decades of experience in urban planning and policy, law, and government.","date":"01\/27\/2021","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/131\/"},{"title":"A Look at DC\u2019s Landmark Library During Renovations","description":"The last field trip for Commissioners pre-COVID was a construction tour of the historic Martin Luther King Jr. Memorial Library while it was still under renovation. The library, located in downtown Washington, DC, has been open since the ribbon cutting ceremony held on September 24, 2020. ","date":"02\/05\/2021","author":"Steve Morgan","link":"https:\/\/www.ncpc.gov\/news\/item\/129\/"},{"title":"NCPC Approves Revised U.S. Air Force Memorial Entrance at Arlington National Cemetery","description":"At its Thursday, February 4, 2021 meeting, the National Capital Planning Commission (NCPC) approved final site and building plans submitted by the U.S. Army Corps of Engineers for a revised entrance to the U.S. Air Force Memorial that will be constructed as part of Arlington National Cemetery\u2019s Southern Expansion project. The new vehicular entrance gate will be at the intersection of Columbia Pike and Air Force Memorial Drive. The updated design includes additional landscaping, three new bollards, a new knee wall, and refinements to the gate design. This approval concludes NCPC\u2019s review of the Southern Expansion project. ","date":"02\/05\/2021","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/134\/"},{"title":"Exploring Washington\u2019s Memorials to African Americans","description":"Black history is not just the history of African Americans, but the history of the United States as a whole. This Black History Month, we\u2019re highlighting commemorative works that celebrate the accomplishments of lesser-known figures and groups that left an indelible mark on this nation and its capital. ","date":"02\/17\/2021","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/132\/"},{"title":"NCPC Approves Final Plans for Second Division Memorial Modification","description":"At its March 4, 2021 online meeting the National Capital Planning Commission unanimously approved preliminary and final site development plans submitted by the National Park Service, in cooperation with the Second Indianhead Division Association Memorials Foundation, to modify the Second Division Memorial located at the corner of Constitution Avenue and 17th Street, NW in President\u2019s Park. The memorial honors service members who lost their lives fighting with the United States Army\u2019s Second Division during World War I, World War II, and the Korean War. New inscriptions would honor those fallen in Korea on the Demilitarized Zone (1965-1991), Iraq (2003-2010), and Afghanistan (2009-2013), and would not include names of individuals.","date":"03\/05\/2021","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/133\/"},{"title":"Federal Workplace Element Revised","description":"At the March 4, 2021 meeting, the Commission authorized an amendment to the 2016 Federal Workplace Element that changes the Central Employment Area (CEA) description, boundary, and policy. NCPC prioritizes the location of federal offices within this area. ","date":"03\/12\/2021","author":"Angela Dupont","link":"https:\/\/www.ncpc.gov\/news\/item\/136\/"},{"title":""Washington is Not Just Another City"","description":"The Washington, DC we know today cannot be understood without understanding and remembering the important people who helped shape it. Elizabeth \u201cLibby\u201d Rowe, NCPC\u2019s first female Chair, was a dynamic leader who established historical preservation as an active concern of the Commission and sought to encourage grassroots participation In furthering Washington as a great city. ","date":"03\/18\/2021","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/135\/"},{"title":"NCPC Provides Feedback on Plans for a New Bureau of Engraving and Printing Facility","description":"At its April 1, 2021 meeting the National Capital Planning Commission provided feedback to the U.S. Army Corps of Engineers and the Bureau of Engraving and Printing (BEP) on concept plans for a new currency production facility on a 100-acre site owned by the federal government in Beltsville, Maryland. The 921,600 square foot building would replace an existing downtown Washington, DC printing facility built in 1914 that no longer efficiently supports manufacturing needs. A new facility would be less expensive than renovating the existing one.","date":"04\/08\/2021","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/138\/"},{"title":"Where are we headed? Recent data on COVID-19\u2019s impacts on transportation","description":"The world is far from truly understanding the long-term effects of the COVID-19 pandemic. However, the pandemic\u2019s one-year anniversary provides a useful benchmark for assessing its near-term impacts. At the April 1, 2021 Commission meeting, Tim Canan, Director of Planning Data and Research for the Metropolitan Washington Council of Governments (COG), shared a multi-sector snapshot of COVID-19\u2019s regional impacts to date, with a focus on transportation.","date":"04\/14\/2021","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/137\/"},{"title":"A Vision for Sustainability: Revisiting the SW Ecodistrict Initiative ","description":"Launched in 2011, the SW\u202fEcodistrict\u202fInitiative, and the resulting\u202fSW\u202fEcodistrict\u202fPlan: A Vision for a More Sustainable Future (2013), were recently in the news as Congresswoman Eleanor Holmes Norton responded to the proposed American Jobs Plan, President Biden\u2019s infrastructure bill.","date":"04\/28\/2021","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/139\/"},{"title":"NCPC Updated on Proposed Baltimore-Washington Superconducting Maglev","description":"At its May 6, 2021 meeting the National Capital Planning Commission (NCPC) heard an information presentation (no official action is taken on information presentations) by NCPC staff on the proposed Baltimore-Washington Superconducting Maglev project. The Maglev would connect the two cities via high-speed rail in 15 minutes along a 33-to-36-mile alignment. Stations would be located east of Mount Vernon Square in Washington, at Baltimore\/Washington International Thurgood Marshall Airport, and in Baltimore\u2019s Cherry Hill neighborhood or Camden Yards. The two potential route alignments, one on the east side of the Baltimore-Washington Parkway and the other on the parkway\u2019s eastern side, and a proposed maintenance facility, would have impacts on federal land and facilities.","date":"05\/10\/2021","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/140\/"},{"title":"Military Appreciation Month","description":"In 1999 Congress officially recognized May as National Military Appreciation Month. The month includes several key dates related to the men and women serving or who have served in the military. ","date":"05\/13\/2021","author":"Steve Morgan","link":"https:\/\/www.ncpc.gov\/news\/item\/141\/"},{"title":"Celebrating Asian American and Pacific Islander Heritage Month ","description":"In honor of Asian American and Pacific Islander Heritage Month, we are proud to highlight memorials and sites in the National Capital Region that celebrate the rich history and contributions of this diverse group.","date":"05\/19\/2021","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/142\/"},{"title":"NCPC Approved Final Plans for President Franklin D. Roosevelt Prayer Plaque","description":"At its June 3, 2021 meeting NCPC heard an update on the Pennsylvania Avenue Initiative and its work to transform the avenue between the White House and the U.S. Capitol.","date":"06\/08\/2021","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/145\/"},{"title":"America\u2019s Civic Stage: A Vision to Celebrate Pennsylvania Avenue ","description":"Pennsylvania Avenue between the White House and the U.S. Capitol is one of the most symbolic spaces in the country. Despite its stature, the Avenue doesn\u2019t provide a good experience for people who use it daily or provide adequate connections to surrounding areas. Enter the Pennsylvania Avenue Initiative\u2019s Focus Group, a multidisciplinary group of experts who brainstormed and developed some high-level ideas about the Avenue\u2019s future and potential physical and programmatic changes. ","date":"06\/11\/2021","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/143\/"},{"title":"The AIDS Memorial Quilt: A Living Memorial","description":"The AIDS Memorial Quilt, designed by the NAMES Project Foundation to memorialize a generation lost to AIDS and help people understand the disease\u2019s devastating impact, is the largest community arts project in the world. In honor of LGBTQ+ Pride Month, we explore how this living memorial serves as a powerful example of how commemoration can take different forms beyond permanent structures such as museums and memorials. ","date":"06\/14\/2021","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/146\/"},{"title":"Open to the Public: What\u2019s the Big Deal with a Little Security? ","description":"On May 25, NCPC and the District Office of Planning co-hosted \"What\u2019s the Big Deal with a Little Security?,\" a panel discussion on the impacts of security on public life and public access. This blog provides event highlights and a link to the full video recording. ","date":"06\/14\/2021","author":"Melissa Lindsjo","link":"https:\/\/www.ncpc.gov\/news\/item\/144\/"},{"title":"Pride in Planning","description":"The American Planning Association\u2019s (APA) Planning magazine convened members of APA's LGBTQ and Planning Division, including NCPC Executive Director Marcel Acosta, to discuss the communities' needs, what the profession can do to help, and how their identities impact their own work as planners. ","date":"07\/01\/2021","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/147\/"},{"title":"NCPC Provides Feedback on Smithsonian South Mall Campus Historic Core Revitalization ","description":"At its July 1, 2021 meeting the National Capital Planning Commission (NCPC) adopted a resolution that the Comprehensive Plan for the National Capital: District Elements\u2014Comprehensive Plan Amendment Act of 2021 would not have a negative impact on the interests or functions of the federal establishment in the National Capital. Per the National Capital Planning Act, which is NCPC\u2019s enabling legislation, NCPC\u2019s federal interest review of the District Elements must focus on this. Federal Elements include federal land, buildings, and operations, as well as those related to Washington\u2019s role as the nation\u2019s capital including form, character and experience, especially within the historic L\u2019Enfant City.","date":"07\/06\/2021","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/148\/"},{"title":"Urban Land Institute Members Champion U.S. Parks ","description":"In honor of Park and Recreation Month, the Urban Land Institute (ULI) invited ULI members and land use professionals from across the US, including NCPC Executive Director Marcel Acosta, to discuss the importance of real estate industry support for parks and their own experiences as park champions. ","date":"07\/14\/2021","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/150\/"},{"title":"NCPC to Conduct Online Commission Meetings through Early 2022 ","description":"This fall, NCPC will start renovations of its offices and the Commission Chambers. As a result of these upcoming renovations, and as we continue to monitor health guidance, NCPC will continue to conduct online Commission meetings until construction is complete, which is expected to be in early spring 2022. We are well prepared to do so, thanks to our experience over the past year and timely transition to digital submissions of project applications and meeting materials.","date":"07\/14\/2021","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/149\/"},{"title":"NCPC Staff Shout Out their Favorite Parks ","description":"July is Park and Recreation Month! To celebrate, we\u2019ve asked our staff to share their favorite parks and where they found fresh air and refuge during the lockdown. ","date":"07\/20\/2021","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/151\/"},{"title":"Highlights Reel from Pennsylvania Avenue Initiative Panel Discussion ","description":"On June 29, NCPC hosted America\u2019s Civic Stage: A Vision to Celebrate Pennsylvania Avenue, a discussion on bold ideas to reinvigorate Pennsylvania Avenue between the White House and U.S. Capitol. Six panelists from a range of professions impacting the built environment inspired attendees to imagine the Avenue as a civic stage showcasing diverse and nationally significant arts, culture, and entertainment experiences. To spotlight some of the event\u2019s highlights, we created a short reel of the discussion. After that entices you, the full event recording is also available for viewing. ","date":"08\/16\/2021","author":"Sarah Ridgely","link":"https:\/\/www.ncpc.gov\/news\/item\/152\/"},{"title":"Construction Watch: Johns Hopkins University\u2019s New Washington, D.C. Center ","description":"If you\u2019ve recently visited the U.S. Capitol or the National Gallery of Art, you may have noticed a large construction project at 555 Pennsylvania Avenue, NW. That site, previously home to the Newseum, is undergoing renovations into a state-of the-art education hub for Johns Hopkins University. The project was last reviewed by NCPC in April 2020 and includes comprehensive structural and architectural renovations to introduce more sunlight, increase square footage, and support the university\u2019s sustainability goals. ","date":"08\/26\/2021","author":"Sarah Ridgely","link":"https:\/\/www.ncpc.gov\/news\/item\/153\/"},{"title":"NCPC Approves Federal Reserve Board Campus Plans","description":"At its September 2, 2021 meeting (please note that the archive page will updated early next week) the National Capital Planning Commission (NCPC) approved final site and building plans submitted by the Board of Governors of the Federal Reserve System for the renovation and expansion of the Marriner S. Eccles Building, the Board\u2019s headquarters, and an addition to the Federal Reserve Board-East Building. Both buildings are located on Constitution Avenue, NW in Washington, DC. The projects will address needed building system and other upgrades, help reduce leased space, and accommodate future office needs. ","date":"09\/07\/2021","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/154\/"},{"title":"Celebrating Hispanic Heritage Month ","description":"National Hispanic Heritage Month, celebrated from September 15 to October 15, honors the cultures and contributions of Hispanic and Latino Americans. To celebrate, we\u2019re highlighting the National Museum of the American Latino, a museum that the Smithsonian Institution is currently planning.","date":"09\/22\/2021","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/156\/"},{"title":"NCPC Approves Goddard Space Flight Center Master Plan","description":"At its October 7, 2021 meeting, Vice Chair Beth White announced that the Trust for the National Mall was awarded a grant from The Andrew W. Mellon Foundation for its Beyond Granite proposal, which will be conducted in partnership with the National Capital Planning Commission (NCPC) and the National Park Service. This project will result in 8-10 temporary commemorative installations in and around the National Mall and Washington, DC. ","date":"10\/08\/2021","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/157\/"},{"title":"Trust for the National Mall Receives Major Grant for Temporary Commemoration Project","description":"What story does the commemorative landscape of the United States tell? Who do we honor and uplift, and who do we not see in these potent symbols? The Andrew W. Mellon Foundation seeks to explore these questions and recently awarded a multimillion-dollar grant to the Trust for the National Mall to elevate underrepresented stories in Washington, DC's commemorative landscape.","date":"10\/26\/2021","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/159\/"},{"title":"Release of the Updated Transportation Management Plan Handbook ","description":"The National Capital Region faces significant transportation challenges that impact where people live and work, development patterns, environmental conditions, and quality of life. To help guide federal installation planners, NCPC partnered with the General Services Administration (GSA) and Metropolitan Washington Council of Governments (MWCOG) to update the Transportation Management Plan Handbook. ","date":"11\/02\/2021","author":"Kael Anderson","link":"https:\/\/www.ncpc.gov\/news\/item\/155\/"},{"title":"NCPC Provides Feedback on Joint Base Anacostia Bolling Draft Master Plan","description":"At its November 4, 2021 meeting, the National Capital Planning Commission (NCPC) provided feedback to the Department of the Air Force on the draft Installation Development Plan (master plan), Historic Bolling District Plan, and Transportation Management Plan (TMP) for Joint Base Anacostia-Bolling.","date":"11\/08\/2021","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/161\/"},{"title":"Honoring Native American Veterans ","description":"Native American Heritage Month pays tribute to the rich traditions and significant contributions of the first Americans and native peoples of Alaska and Hawaii. ","date":"11\/22\/2021","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/160\/"},{"title":"NCPC Approves Final Hirshhorn Museum Sculpture Garden Revitalization Plans","description":"At its December 2, 2021 meeting, the National Capital Planning Commission (NCPC) approved final site development plans submitted by the Smithsonian Institution for revitalization of the Hirshhorn Museum Sculpture Garden. In its approval the Commission noted that the plans strike an appropriate balance between retaining key elements of the garden\u2019s existing design while incorporating new features to make the garden a more inviting destination. ","date":"12\/06\/2021","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/163\/"},{"title":"Pop Quiz: Do You Know What a Legation Is? ","description":"During NCPC\u2019s December 2021 meeting, Commissioners provided comments on a site selection study submitted by the National Park Service, in collaboration with the Daughters of the Republic of Texas, for the establishment of the Texas Legation Memorial in Washington, DC. ","date":"12\/20\/2021","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/165\/"},{"title":"Catalyzing America\u2019s Clean Energy Economy Through Federal Sustainability ","description":"President Biden signed an executive order that directs the federal government to use its scale and procurement power to support the growth of America\u2019s clean energy and clean technology industries, while accelerating progress toward achieving a carbon pollution-free electricity sector by 2035. ","date":"12\/20\/2021","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/164\/"},{"title":"NCPC Approves U.S. National Arboretum Perimeter Fence and Gate Improvements","description":"At its January 6, 2022 meeting, the National Capital Planning Commission (NCPC) approved preliminary and final site development plans for improvements to the U.S. National Arboretum\u2019s perimeter fence and gates at its 446-acre facility in Northeast Washington, DC. ","date":"01\/07\/2022","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/166\/"},{"title":"NCPC Approves Joint Base Anacostia-Bolling Master Plan ","description":"At its February 3, 2022 meeting, NCPC approved the Joint Base Anacostia-Bolling Installation Development Plan (master plan), Historic Bolling District Plan, and Transportation Management Plan. ","date":"02\/07\/2022","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/168\/"},{"title":"Celebrating Former NCPC Chairman Harvey B. Gantt ","description":"In celebration of Black History Month, we\u2019re excited to honor Harvey B. Gantt, NCPC\u2019s first African American Chairman. Mr. Gantt is also a celebrated architect and politician, with a distinguished record of public service. ","date":"02\/07\/2022","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/167\/"},{"title":"Transformative Vision Presented for Pennsylvania Avenue as a Venue ","description":"Pennsylvania Avenue between the White House and the U.S. Capitol is a unique public space. A new vision and potential concepts for Pennsylvania Avenue were presented at a National Capital Planning Commission Special Session on February 16, 2022. ","date":"02\/17\/2022","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/170\/"},{"title":"NCPC Releases Monumental Core Streetscape Design Guidelines for Public Comment ","description":"Washington\u2019s downtown monumental core features some of the most important civic, cultural, and symbolic structures in the city and nation. NCPC, along with an Interagency Working Group of federal and local partners, drafted Streetscape Design Guidelines, which inform the placement and characteristics of streetscape elements in and around the National Mall.","date":"02\/23\/2022","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/169\/"},{"title":"NCPC Approves Preliminary South Mall Campus Historic Core Plans with a Few Exceptions","description":"National Capital Planning Commission (NCPC) review for major projects involves several stages of development, with feedback provided at each step before final review and approval. One theme at the Thursday, March 3 Commission meeting was that project applicants paid careful attention to previous NCPC input and addressed the Commission\u2019s prior comments, improving previous submissions.","date":"03\/07\/2022","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/171\/"},{"title":"Pennsylvania Avenue Vision Public Comment Period Begins ","description":"A new vision for Pennsylvania Avenue between the White House and the U.S. Capitol was released for public review and input. The vision, and three potential concepts to help achieve it, imagine the avenue transformed into America\u2019s stage and a street that prioritizes people over cars with inviting and inclusive public spaces. ","date":"03\/22\/2022","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/173\/"},{"title":"Uplifting the Histories of American Women ","description":"In celebration of Women\u2019s History Month, we\u2019re spotlighting the Smithsonian Institution's efforts to showcase the historical experiences and impact of women in this country through the American Women\u2019s History Museum and other initiatives.","date":"03\/22\/2022","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/172\/"},{"title":"NCPC Updated on Comprehensive Plan\u2019s Federal Workplace Element","description":"At its Thursday, April 7 meeting the National Capital Planning Commission (NCPC) heard a report on the status of the Comprehensive Plan for the National Capital\u2019s Federal Workplace Element update. ","date":"04\/11\/2022","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/174\/"},{"title":"NCPC Releases Equity Action Plan ","description":"Federal agencies carry out missions that benefit individuals, businesses, and communities. However, entrenched disparities in our nation\u2019s laws and policies have historically denied equal opportunities for all. ","date":"04\/18\/2022","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/175\/"},{"title":"NCPC Updated on the Agency\u2019s Equity Action Plan","description":"NCPC staff provided a presentation on NCPC\u2019s Equity Action Plan. Released on April 14, the plan provides an overview of how the agency will advance equity throughout its work in response to Executive Order 13985: Advancing Racial Equity and Support for Underserved Communities Through the Federal Government. ","date":"05\/09\/2022","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/176\/"},{"title":"Preserving Asian American and Pacific Islander Heritage in the National Capital Region ","description":"May is Asian American and Pacific Islander (AAPI) Heritage Month and Preservation Month. In celebration, we\u2019re highlighting groundbreaking efforts to identify AAPI historical and cultural resources in Maryland and Washington, DC. ","date":"05\/23\/2022","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/178\/"},{"title":"Working with Arlington County to Protect National Mall Views","description":"The form and character of Washington\u2019s monumental core are an important part of how the public experiences our nation\u2019s most beloved memorials, open spaces, and public buildings. NCPC and Arlington County have a shared responsibility for stewardship of the urban design framework of the National Capital Region, including views to and from the monumental core. Over the past year, NCPC reviewed multiple projects in Arlington County to assess the impacts of proposed building heights on views from the National Mall. ","date":"05\/25\/2022","author":"Melissa Lindsjo","link":"https:\/\/www.ncpc.gov\/news\/item\/177\/"},{"title":"NCPC Approves Armed Forces Retirement Home Master Plan Amendment","description":"The National Capital Planning Commission (NCPC) approved the second amendment for the Armed Forces Retirement Home (AFRH) Master Plan. Located at the intersection of North Capitol and Irving Streets, NW, the 272-acre campus provides residences and related services for approximately 600 eligible retired and former members of the Armed Forces. ","date":"06\/07\/2022","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/180\/"},{"title":"The AIDS Memorial Quilt: An Alternative Model for Commemoration ","description":"The National Mall is home to many of the nation\u2019s most treasured institutions and landmarks. These sites are largely built memorials and museums, which are seen as traditional models of commemoration. However, alternative forms of commemorative works can offer opportunities to respond to current events, incorporate broader perspectives and contributors, and reach more audiences and locations. ","date":"06\/10\/2022","author":"Johanna McCrehan","link":"https:\/\/www.ncpc.gov\/news\/item\/179\/"},{"title":"Commuter Connections Awards Employers for Innovation and Excellence in Commuter Benefits Programs","description":"The Metropolitan Washington Council of Governments\u2019 (COG) Commuter Connections program proudly recognized five local employers and organizations today for their outstanding commute alternative programs at the 25th annual Employer Recognition Awards ceremony at the National Press Club.","date":"06\/29\/2022","author":"Steve Kania, Metropolitan Washington Council of Governments","link":"https:\/\/www.ncpc.gov\/news\/item\/181\/"},{"title":"NCPC Provides Positive Feedback on Washington Union Station Expansion Project","description":"At its July 7, 2022 meeting, the National Capital Planning Commission (NCPC) provided comments to the Federal Railroad Administration (FRA) on revised concept plans for the Washington Union Station Expansion Project. The Union Station Redevelopment Corporation, in coordination with Amtrak, has proposed expanding and modernizing the multimodal transportation facilities at Washington Union Station to meet anticipated 2040 demand.","date":"07\/08\/2022","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/182\/"},{"title":"NCPC Approves Preliminary Peace Corps Commemorative Park Plans","description":"At its September 1, 2022, meeting, the National Capital Planning Commission (NCPC) approved preliminary site development plans for the Peace Corps Commemorative Park submitted by the National Park Service, in collaboration with the Peace Corps Commemoration Foundation. The park would honor the founding of the Peace Corps in 1961, the organization\u2019s ideals, and its thousands of volunteers. ","date":"09\/06\/2022","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/183\/"},{"title":"Summary of Pennsylvania Avenue Initiative Public Comments","description":"Federal and District agencies are working together to update the 1974 Pennsylvania Avenue Plan that guided development for nearly five decades. While the plan was foundational and transformative at the time, it hasn\u2019t evolved to fully address current needs and best practices in city planning, urban design, and economic development, particularly in response to the changing market dynamics post-Covid.","date":"09\/22\/2022","author":"Jeff Jamawat","link":"https:\/\/www.ncpc.gov\/news\/item\/185\/"},{"title":"Advancing Equity Planning in the National Capital Region ","description":"On September 30, as part of the 2022 American Planning Association\u2019s National Capital Area Chapter Planning Conference, representatives from NCPC, the District of Columbia Office of Planning (DCOP), and Montgomery County Planning Department discussed how federal and local agencies in the National Capital Region are addressing inequities in their planning work that serve as barriers to equal opportunity. ","date":"10\/21\/2022","author":"Angela Dupont","link":"https:\/\/www.ncpc.gov\/news\/item\/186\/"},{"title":"NCPC Releases Federal Capital Improvements Program Report with New Equity Updates","description":"NCPC recently released this year\u2019s public Federal Capital Improvements Program (FCIP) FY 2022-2027 report. The report helps to guide planning and development in the region and includes new elements that engage federal agencies on equity considerations.","date":"10\/28\/2022","author":"Chrishaun Smith","link":"https:\/\/www.ncpc.gov\/news\/item\/187\/"},{"title":"NCPC Updated on the Pennsylvania Avenue Initiative and Monumental Core Flooding","description":"At its November 3 meeting the National Capital Planning Commission (NCPC) heard four information presentations. No action is taken on information presentations. First, NCPC staff presented a summary of the Pennsylvania Avenue Initiative Public Comments received earlier this year on a new vision for the Avenue between the White House and the U.S. Capitol. During the 136-day public comment period (March 16-July 29, 2022) the agency received more than 450 comments. ","date":"11\/07\/2022","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/189\/"},{"title":"NCPC Approves Final Plans for the National Desert Shield and Desert Storm Memorial","description":"At its December 1 meeting the National Capital Planning Commission (NCPC) approved final site development plans for the National Desert Shield and Desert Storm Memorial submitted by the National Park Service in collaboration with the National Desert Storm War Memorial Association. ","date":"12\/05\/2022","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/190\/"},{"title":"President Biden Appoints Two New Commission Members","description":"On November 10, 2022, President Biden appointed two new members to the 12-member National Capital Planning Commission (NCPC). Elizabeth M. Hewlett will represent the state of Maryland and Bryan Clark Green will represent the state of Virginia. The December 1, 2022 NCPC meeting was their first as members of the Commission.","date":"12\/12\/2022","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/191\/"},{"title":"NCPC Provides Feedback on Tidal Basin and West Potomac Park Seawalls Rehabilitation Plans","description":"The National Capital Planning Commission\u2019s (NCPC) January 5 meeting began with a tribute to outgoing Chair Beth White, whose 11-year term on the Commission ended on January 2, 2023. First appointed by President Obama on January 4, 2012 as an at-large representative, she was designated Chair by President Biden on November 23, 2021.","date":"01\/06\/2023","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/192\/"},{"title":"Resource Guide: Foreign Missions in Washington ","description":"To help the public and project applicants better understand the range of authorities, we\u2019ve developed resource guides that cover commemorative works, transportation facilities, environmental compliance, and more. This blog highlights the resource guide on the review process for foreign missions. ","date":"01\/24\/2023","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/184\/"},{"title":"President Biden Designates Teri Hawks Goodmann as National Capital Planning Commission Chair","description":"President Biden appointed Teri Hawks Goodmann for a six-year term as the at-large Presidential appointee to the National Capital Planning Commission (NCPC) that extends to 2029. He also designated her to serve as Commission Chair. Ms. Goodmann\u2019s first meeting will take place on Thursday, February 2, 2023 beginning at 1:00 pm EST (12:00 CST). It will be livestreamed. ","date":"01\/30\/2023","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/193\/"},{"title":"NCPC Provides Feedback on Joint Base Myer-Henderson Hall and Fort McNair Master Plan ","description":"The National Capital Planning Commission\u2019s (NCPC) February 2 meeting was the first led by new Chair Teri Hawks Goodmann. There was one item on the agenda, with the Commission providing comments on the concept master plan (also known as an Area Development Plan) for Joint Base Myer-Henderson Hall submitted by the Department of the Army. ","date":"02\/03\/2023","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/194\/"},{"title":"Five Questions for NCPC Vice-Chair Col. Arrington Dixon ","description":"Time flies when you\u2019re having fun! To celebrate Black History Month, we posed some questions for NCPC Vice-Chair Colonel Arrington Liggins Dixon, who has served on the Commission as a Mayoral appointee since 1995 and is its longest current serving member. Vice-Chair Dixon boasts an illustrious career in public service and the private sector. ","date":"02\/16\/2023","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/195\/"},{"title":"NCPC Accepts Monumental Core Streetscape Design Guidelines: Vertical and Surface Elements","description":"At its March 2, 2023 meeting the National Capital Planning Commission (NCPC) accepted the final Monumental Core Streetscape Design Guidelines: Vertical and Surface Elements. The guidelines are part of a comprehensive update of the Streetscape Manual (1992) that contains details and specifications which federal and District agencies use to achieve consistency in streetscapes on the National Mall and vicinity. ","date":"03\/03\/2023","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/197\/"},{"title":"Pennsylvania Avenue Initiative Wins Momentum Award","description":"On March 29 the DowntownDC Business Improvement District (BID) awarded the Pennsylvania Avenue Initiative its 2022 Public Sector Person, Project, or Program of the Year Momentum Award at a ceremony held at the Ronald Reagan Building and International Trade Center. The award honored the initiative\u2019s community outreach and engagement work. ","date":"03\/31\/2023","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/196\/"},{"title":"NCPC Provides Feedback on Fallen Journalists and Global War on Terrorism Memorials Site Selections","description":"At its April 6 2023 meeting the National Capital Planning Commission (NCPC) provided feedback on sites for two proposed memorials in Washington, DC. Input regarding each site\u2019s challenges and opportunities will assist the National Park Service (NPS) and memorial sponsors as they further evaluate each to determine their preferred sites, which will be submitted for NCPC review at a later date.","date":"04\/10\/2023","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/199\/"},{"title":"Resource Guide: NCPC Plan Review","description":"One of NCPC\u2019s core activities is to review federal plans and projects, a responsibility established with the National Capital Planning Act of 1952. NCPC\u2019s review role is unique: federal properties are not subject to local land use controls elsewhere in the United States.","date":"04\/20\/2023","author":"Steve Morgan","link":"https:\/\/www.ncpc.gov\/news\/item\/202\/"},{"title":"NCPC Releases Streetscape Design Guidelines: Small\u2013Scale Elements for Public Comment ","description":"NCPC released the Draft Streetscape Design Guidelines: Small-Scale Elements. These guidelines inform the placement and characteristics of streetscape furnishings and civic infrastructure including benches, waste receptacles, bicycle racks, and utility boxes, among others, in and around the National Mall. NCPC, together with the federal and District agencies responsible for these streetscapes, developed these guidelines to provide a coordinated approach to ensure the area\u2019s beauty and functionality. \r\n","date":"04\/21\/2023","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/201\/"},{"title":"NCPC Provides Feedback on New U.S. National Arboretum Entrance","description":"At its May 4, 2023 meeting the National Capital Planning Commission (NCPC) provided feedback on a proposed new main entrance for the U.S. National Arboretum. The Arboretum seeks a new main vehicle entrance on Bladensburg Road, NE, a new 1,200-foot access road from it to Azalea Road, and the refurbishment of a 3,700 section of Azalea Road on the Arboretum grounds.","date":"05\/05\/2023","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/203\/"},{"title":"Resource Guide: Master Plan Review and Controlled Unclassified Information ","description":"But what happens when some of the information is designated Controlled Unclassified Information (CUI)? Examples of CUI include financial information, payroll information, and proprietary information. NCPC has prepared a resource guide that explains the process of master plan reviews and how the Commission handles CUI.","date":"05\/11\/2023","author":"Steve Morgan","link":"https:\/\/www.ncpc.gov\/news\/item\/204\/"},{"title":"NCPC Approves Preliminary Tidal Basin and West Potomac Park Seawall Rehabilitation Plans","description":"At its June 1, 2023 meeting NCPC approved preliminary site development plans for the Tidal Basin and West Potomac Park Seawall Rehabilitation submitted by the National Park Service. Plans call for the repair and rehabilitation of approximately 6,800 linear feet of the seawall along portions of the Tidal Basin and West Potomac Park. ","date":"06\/05\/2023","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/205\/"},{"title":"Resource Guide: Memorial Site Selection and Design Review ","description":"Commemorative works, which include monuments and memorials, are key elements of Washington, DC\u2019s symbolic landscape, telling stories of our nation\u2019s history and heritage, and recognizing important events, and groups. The Commemorative Works Act of 1986 authorizes that NCPC play a critical role, through policy and review, in guiding the location and design of commemorative works on federal land in the nation\u2019s capital. To help memorial sponsors, NCPC prepared a resource guide to explain the role it and other agencies play in this process. ","date":"06\/23\/2023","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/206\/"},{"title":"Five Questions for NCPC Commissioner Bryan Green","description":"NCPC Commissioner Bryan Green has been on the Commission since December 2022. He is an architectural historian by education and training and leverages his expertise to embrace the role of architecture in America\u2019s larger story. As one of the newest presidential appointees, we asked Mr. Green about how his experiences help navigate the Commission's review process.","date":"07\/05\/2023","author":"Steve Morgan","link":"https:\/\/www.ncpc.gov\/news\/item\/207\/"},{"title":" NCPC Provides Feedback on National 9\/11 Pentagon Memorial Visitor Center Design","description":"At its July 6, 2023 meeting the National Capital Planning Commission (NCPC) provided feedback on concept plans submitted by Arlington National Cemetery, on behalf of the Pentagon Memorial Fund, for the proposed two-story 50,000 square foot National 9\/11 Pentagon Memorial Visitor Education Center. It would be located on a 3.71-acre site that is part of the Arlington National Cemetery Southern Expansion and near the existing memorial. ","date":"07\/10\/2023","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/208\/"},{"title":"Pennsylvania Avenue Initiative Partnership and Milestones Announced","description":"The National Capital Planning Commission (NCPC), District of Columbia Mayor Muriel Bowser, and leadership of federal and District agencies involved in the Pennsylvania Avenue Initiative are pleased to announce an important partnership and an important milestone for the initiative. ","date":"07\/31\/2023","author":"Julia Koster","link":"https:\/\/www.ncpc.gov\/news\/item\/209\/"},{"title":"NCPC Approves Preliminary Constitution Gardens Rehabilitation Plans","description":"At its September 7, 2023 meeting the National Capital Planning Commission (NCPC) approved preliminary site development plans submitted by the National Park Service, in partnership with the Trust for the National Mall, for the second phase of the Constitution Gardens Rehabilitation. Plans would reconstruct Constitution Gardens\u2019 lake into a sustainable, social, and ecological garden while respecting the original design\u2019s legacy.","date":"09\/11\/2023","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/212\/"},{"title":"Expanding America\u2019s Stories on the National Mall","description":"On September 18, Beyond Granite: Pulling Together closed after a whirlwind month of exploration and enjoyment of the first ever curated art exhibition on the National Mall. The exhibition featured work by six contemporary artists that all responded to the question, \u201cWhat stories remain untold on the National Mall?\u201d","date":"10\/10\/2023","author":"Brittney Drakeford and Johanna McCrehan","link":"https:\/\/www.ncpc.gov\/news\/item\/210\/"},{"title":"NCPC Approves Final Bureau of Engraving and Printing Currency Production Facility Plans","description":"At its October 5, 2023 meeting the National Capital Planning Commission (NCPC) approved final site and building plans for the Bureau of Engraving and Printing Currency Production Facility to be located in Beltsville, Maryland. Plans are for a new 920,000 square foot 40-50\u2019 tall facility to be located on a 104-acre site on the Beltsville Agricultural Research Center grounds.","date":"10\/10\/2023","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/211\/"},{"title":"NCPC Provides Feedback on the Draft Washington Navy Yard Southeast Corner Master Plan","description":"At its November 2, 2023 meeting the National Capital Planning Commission (NCPC) provided input to the U.S. Department of the Navy, Naval Facilities Engineering Systems Command Washington on the draft Washington Navy Yard Southeast Corner Master Plan. ","date":"11\/07\/2023","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/213\/"},{"title":"Johns Hopkins University Brings New Vitality to Pennsylvania Avenue","description":"From the Wilson Building overlooking Freedom Plaza to the Federal Triangle, National Archives, Embassy of Canada, and National Gallery of Art, Pennsylvania Avenue between the White House and U.S. Capitol has always been the site of prominent civic and cultural institutions.","date":"11\/16\/2023","author":"Paul Medvetsky *","link":"https:\/\/www.ncpc.gov\/news\/item\/214\/"},{"title":" NCPC and COG Staff Present Draft Federal Telework Study Findings","description":"At its December 7, 2023 meeting the National Capital Planning Commission (NCPC), the Metropolitan Washington Council of Governments (COG), and consultants presented initial findings from a Workplace Scenario Planning Study commissioned by NCPC and COG. Scenario planning was used to better understand the cumulative impacts of federal telework and hybrid practices on workplaces, work forces, and transportation within the National Capital Region. ","date":"12\/11\/2023","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/215\/"},{"title":"Eat, Play, Move on Pennsylvania Avenue","description":"As progress and momentum around NCPC\u2019s Pennsylvania Avenue Initiative continue to grow into the new year, federal and District partners are working to bring the vision of the Avenue as a Venue closer to reality. ","date":"12\/21\/2023","author":"Paul Medvetsky *","link":"https:\/\/www.ncpc.gov\/news\/item\/216\/"},{"title":"NCPC Releases Comprehensive Plan and Submission Guidelines Updates for Public Comment ","description":"NCPC drafted updates to the Comprehensive Plan\u2019s Introduction Chapter that incorporate equity and climate resilience considerations and propose guidance for addressing the evolving needs of the federal workforce. The public is invited to comment on these updates from December 13, 2023 to March 12, 2024.","date":"12\/27\/2023","author":"Brittney Drakeford","link":"https:\/\/www.ncpc.gov\/news\/item\/217\/"},{"title":"NCPC Updated on Pennsylvania Avenue Initiative","description":"At its January 4, 2024 meeting the National Capital Planning Commission (NCPC) heard a progress update on the Pennsylvania Avenue Initiative, a joint federal-District effort to revitalize the 1.2 mile stretch of the Avenue between the White House and the U.S. Capitol and transform it into an inspiring public space destination. ","date":"01\/05\/2024","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/218\/"},{"title":"Resource Guide: Pollinators Best Practices","description":"On January 4, 2024, NCPC presented a Pollinators Best Practices Resource Guide (Resource Guide) as an Information Presentation to the Commission. The Resource Guide was developed by staff to clarify how NCPC incorporates plants that support pollinators in its review of proposed projects.","date":"01\/22\/2024","author":"Stephanie Free","link":"https:\/\/www.ncpc.gov\/news\/item\/219\/"},{"title":"NCPC Approves Anacostia Riverwalk Trail Extension and National Arboretum Access Bridge Final Plans","description":"At its February 1, 2024 meeting the National Capital Planning Commission (NCPC) approved preliminary and final site development plans for the Anacostia Riverwalk Trail Extension and National Arboretum Access Bridge. Plans submitted by the National Park Service, in collaboration with the District Department of Transportation, are for the extension of the Anacostia Riverwalk Trail through the Kenilworth portion of Anacostia Park and across the Anacostia River to the National Arboretum. ","date":"02\/05\/2024","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/220\/"},{"title":"Regional Workplace Scenario Planning Study Explores Impact of Telework","description":"Teleworking accelerated during the pandemic, altering where people work and commute. While this trend is playing out across the country, the National Capital Region has a unique set of challenges, as its largest single employer is the federal government. The National Capital Planning Commission (NCPC), a federal agency, and the Metropolitan Washington Council of Governments (COG), an association of local governments, joined together to develop a scenario-based study to better understand how this trend might impact the region and its individual jurisdictions.","date":"02\/12\/2024","author":"Julia Koster and Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/221\/"},{"title":"Reimagining the Future of Downtown Together","description":"The Pennsylvania Avenue Initiative has come a long way with a strong federal-District partnership aligned on a new vision of the Avenue as a Venue to support downtown revitalization and the local economy. Significant progress has laid a solid foundation and momentum for the important work ahead.","date":"02\/26\/2024","author":"Paul Medvetsky* ","link":"https:\/\/www.ncpc.gov\/news\/item\/222\/"},{"title":"NCPC Approves Final Constitution Gardens Rehabilitation-Phase 2 Plans","description":"At its March 7, 2024 meeting the National Capital Planning Commission (NCPC) approved final site development plans for the Constitution Gardens Rehabilitation\u2013Phase 2 submitted by the National Park Service, in partnership with the Trust for the National Mall. Constitution Gardens is located on approximately 43-acres on the National Mall south of Constitution Avenue, NW and west of 17th Street, NW. It was originally designed to celebrate the nation\u2019s bicentennial. ","date":"03\/11\/2024","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/223\/"},{"title":"HR&A Advisors Selected as First Consultant Team to Begin Work on a New Pennsylvania Avenue Plan ","description":"The National Capital Planning Commission (NCPC), on behalf of the Pennsylvania Avenue Partnership, announces the selection of HR&A Advisors as the first of two consultant teams to develop the New Pennsylvania Avenue Plan. The Partnership comprises the U.S. General Services Administration, National Park Service, District Government, EventsDC, DowntownDC Business Improvement District, and NCPC. ","date":"03\/21\/2024","author":"Julia Koster","link":"https:\/\/www.ncpc.gov\/news\/item\/224\/"},{"title":" NCPC Approves Final District of Columbia Archives Building Plans","description":"At its April 4, 2024 meeting the National Capital Planning Commission (NCPC) approved preliminary and final site and building plans for a new District of Columbia Archives Building submitted by the District of Columbia Department of General Services. The proposed four story, 118,000 gross square foot building will replace the existing Building #41 on the University of the District of Columbia (UDC) campus in Northwest Washington. The building will house offices as well as research, exhibit, meeting, archival storage, and document processing space and replace the current facility at 1300 Naylor Court, NW.","date":"04\/08\/2024","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/226\/"},{"title":"NCPC Approves Preliminary Rock Creek Park Golf Course Rehabilitation Plans","description":"At its May 2, 2024 meeting the National Capital Planning Commission (NCPC) approved preliminary site and building plans submitted by the National Park Service, in cooperation with National Links Trust, to rehabilitate the Rock Creek Park Golf Course. Initially built between 1921 and 1927, the parkland-style golf course has 18 holes.","date":"05\/07\/2024","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/225\/"},{"title":"Moving the Pennsylvania Avenue Vision Forward","description":"With the first consultant team, HR&A Advisors, hired in March, NCPC and the project partners are advancing the vision of the Avenue as a Venue. Understanding Pennsylvania Avenue\u2019s role and function in post-pandemic downtown Washington is fundamental to successfully reimagining the Avenue as a new public space destination and transportation corridor. ","date":"06\/04\/2024","author":" Paul Medvetsky* ","link":"https:\/\/www.ncpc.gov\/news\/item\/227\/"},{"title":"NCPC Adopts Updated Comprehensive Plan Introduction Chapter","description":"At its June 6, 2024 meeting the National Capital Planning Commission (NCPC) adopted updates to the Introduction Chapter for the Comprehensive Plan for the National Capital: Federal Elements. The Introduction Chapter outlines the planning framework and guiding principles for the Federal Elements. NCPC uses the Federal Elements\u2019 policies to guide agency actions, including review of projects and long-range plans that affect federal projects, and master plans. The Commission last adopted the Introduction Chapter in 2016.","date":"06\/12\/2024","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/228\/"},{"title":"NCPC Provides Feedback on Hirshhorn Museum and Plaza Revitalization Plans","description":"At its July 11, 2024 meeting the National Capital Planning Commission (NCPC) provided feedback to the Smithsonian Institution on concept plans for the revitalization of the Hirshhorn Museum Building and Plaza located on the National Mall. The museum, plaza, and streetscape would be renovated, accessibility improved, and the museum expanded from 167,000 square feet to approximately 234,000 square feet. The museum opened in 1974.","date":"07\/12\/2024","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/229\/"},{"title":"A New Future for Commemoration? Insights from the Beyond Granite Key Findings Report","description":"At the end of May, the Beyond Granite partners\u2014the Trust for the National Mall, NCPC, and National Park Service\u2014released the Key Findings report from the Beyond Granite: Pulling Together pilot exhibition. Dr. Elizabeth Morton, author of the assessment report, asserts that significant public demand exists for such exhibitions on the National Mall, including a strong desire to explore contemporary themes in a commemorative context.","date":"07\/26\/2024","author":"Justine Brandes *","link":"https:\/\/www.ncpc.gov\/news\/item\/230\/"},{"title":"NCPC Approves Final Rock Creek Park Golf Course Rehabilitation Plans","description":"At its September 5, 2024 meeting the National Capital Planning Commission (NCPC) approved final site and building plans submitted by the National Park Service (NPS), in cooperation with National Links Trust, to rehabilitate the Rock Creek Park Golf Course. Located on the east side of Rock Creek Park at the intersection of Military Road and 16th Street, NW, the approximately 100-acre course constructed between 1921-1927 currently has an 18-hole parkland style golf course (although not all holes are playable) and an outdated clubhouse.","date":"09\/06\/2024","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/231\/"},{"title":"Celebrating a Milestone: NCPC\u2019s Revised Introduction Chapter Embraces Equity and Resilience","description":"On June 6, 2024, marking a century since its founding, the National Capital Planning Commission (NCPC) unveiled a pivotal update to the Introduction Chapter of the Federal Elements of the Comprehensive Plan, and corresponding updates to the Submission Guidelines. ","date":"09\/10\/2024","author":"Brittney Drakeford","link":"https:\/\/www.ncpc.gov\/news\/item\/232\/"},{"title":"Summer Internship Review","description":"This summer, the National Capital Planning Commission (NCPC) welcomed a new cohort of enthusiastic interns eager to dive into the world of federal planning, urban design, and policymaking. I was among the four students whose journey with NCPC has been both impactful and transformative. ","date":"09\/16\/2024","author":"Daniel Leaks","link":"https:\/\/www.ncpc.gov\/news\/item\/233\/"},{"title":"DAVID RUBIN Land Collective Selected as New Pennsylvania Avenue Plan Design Consultant ","description":"The National Capital Planning Commission (NCPC), on behalf of the Pennsylvania Avenue Partnership, announces the selection of DAVID RUBIN Land Collective (Land Collective) to lead design of the New Pennsylvania Avenue Plan in collaboration with HR&A Advisors (HR&A), whose role was announced earlier this year. The partnership comprises the U.S. General Services Administration, National Park Service, District of Columbia Government, Events DC, DowntownDC Business Improvement District, and NCPC.","date":"10\/03\/2024","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/234\/"},{"title":"NCPC Provides Feedback on Fallen Journalists Memorial Concept Plans","description":"At its October 3, 2024 meeting the National Capital Planning Commission (NCPC) provided comments on concept plans for the Fallen Journalists Memorial submitted by the National Park Service in collaboration with the Fallen Journalists Memorial Foundation. The proposed memorial would be located on a 0.3-acre triangular park at the intersection of Independence Avenue, Maryland Avenue, and 3rd Street, SW. The design consists of a hardscape stone plaza with a grove of trees and an array of cast glass elements. It would have three outdoor areas: Remembrance Hall, the press room, and a classroom.","date":"10\/07\/2024","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/235\/"},{"title":"NCPC Receives Several Awards from Regional Leadership Organizations","description":"The National Capital Planning Commission (NCPC) is honored to receive several awards for planning work over the past year. ","date":"10\/17\/2024","author":"Johanna McCrehan","link":"https:\/\/www.ncpc.gov\/news\/item\/236\/"},{"title":"NCPC Approves Joint Base Andrews Child Development Center Preliminary Plans","description":"At its November 7, 2024 meeting the National Capital Planning Commission (NCPC) approved preliminary site and building plans for a Child Development Center at Joint Base Andrews in Camp Springs, Maryland. Plans submitted by the U.S. Department of Defense are for a new 23,000 square foot facility. It will be located at the intersection of Arkansas Road and California Avenue in the Installation\u2019s Administrative and Support District. ","date":"11\/08\/2024","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/237\/"},{"title":"NCPC Approves Peace Corps Commemorative Park Final Plans","description":"At its December 5, 2024 meeting the National Capital Planning Commission (NCPC) approved final site development plans for the Peace Corps Commemorative Park. Submitted by the National Park Service, in collaboration with the Peace Corps Commemorative Foundation, plans are for an approximately 7,200 square feet park in a triangular-shaped plot bounded by Louisiana Avenue, NW, First Street, NW, and C Street, NW. Commissioners expressed support for the mission of the Peace Corps and appreciated the applicant\u2019s responsiveness to previous comments.","date":"12\/06\/2024","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/238\/"},{"title":"NCPC\u2019s Marcel Acosta Receives Regional Leadership Award","description":"NCPC Executive Director Marcel Acosta received the Ronald F. Kirby Award for Collaborative Leadership from the Metropolitan Washington Council of Governments (COG). COG Executive Director Clark Mercer presented him with the award at COG\u2019s annual membership and awards meeting on December 11, 2024 at the DC Water\u2019s headquarters.","date":"12\/12\/2024","author":"Julia Koster","link":"https:\/\/www.ncpc.gov\/news\/item\/239\/"},{"title":"NCPC Approves Several Projects through a Notational Vote","description":"While the National Capital Planning Commission\u2019s January 9, 2025 meeting was cancelled due to the federal government closure in observance of President Carter\u2019s funeral, the Commission voted to approve several projects through a notational vote.","date":"01\/15\/2025","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/240\/"},{"title":"NCPC Provides Feedback on Glen Echo Management Plan Amendment ","description":"At its Thursday, February 6 meeting the National Capital Planning Commission (NCPC) provided feedback to the National Park Service on the Glen Echo Management Plan Amendment. The master plan for the 0.9-acre park located in Glen Echo, Maryland would guide an increase in capacity for arts and cultural programming, special events, and future programs. Glen Echo Park is a National Register National Historic District, has approximately 350,000 annual visitors, and is co-managed by the National Park Service and Montgomery County, Maryland.","date":"02\/07\/2025","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/241\/"},{"title":"NCPC Provides Feedback on Tidal Basin Development Plans","description":"At its Thursday, March 6 meeting the National Capital Planning Commission (NCPC) provided feedback to the National Park Service on the Tidal Basin Development Concept Plan. The concept includes three alternatives that propose flexible public spaces to accommodate a wide variety of national celebrations, First Amendment gatherings, and other permitted activities to improve the year-round visitor experience. It also includes initial design options for a vehicle barrier system around the Jefferson Memorial. The plan area is approximately 250 acres.","date":"03\/07\/2025","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/242\/"},{"title":"NCPC Celebrates the Life and Career of Former Chairman David Childs","description":"The National Capital Planning Commission recognizes the substantial contributions of David M. Childs to the agency and to Washington, DC. NCPC sends its deepest condolences to his family, colleagues, and friends. He will be missed.","date":"04\/02\/2025","author":"Marcel Acosta","link":"https:\/\/www.ncpc.gov\/news\/item\/243\/"},{"title":"NCPC Provides Feedback on Concept Master Plan for Poplar Point","description":"At its Thursday, April 3 meeting the National Capital Planning Commission (NCPC) provided feedback to the National Park Service on the concept Poplar Point Master Plan. The plan, submitted in coordination with the District of Columbia Office of the Deputy Mayor for Planning and Economic Development and the DC Office of Planning, offers three options for redeveloping the 110-acre site located in Southeast Washington across the Anacostia River from Nationals Park. ","date":"04\/04\/2025","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/244\/"},{"title":"NCPC Provides Feedback on Rock Creek & Potomac Pkwy and Capital One Arena Improvements Concept Plans","description":"At its Thursday, May 1 meeting the National Capital Planning Commission (NCPC) provided feedback to the National Park Service on the concept Rock Creek and Potomac Parkway Multimodal Safety and Operational Improvements Plan. The project includes several operational and physical improvements. ","date":"05\/02\/2025","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/245\/"},{"title":" NCPC Bids Farewell to Agency Directors","description":"NCPC bids farewell to Julia Koster, Flooding and Resiliency Project Director, and Michael Sherman, Long Range Planning Division Director. ","date":"05\/22\/2025","author":"Marcel Acosta","link":"https:\/\/www.ncpc.gov\/news\/item\/246\/"},{"title":"ULI Washington TAP Lays Out Framework for Disposition and Redevelopment of the Forrestal Building ","description":"An Urban Land Institute Washington (ULI) Technical Assistance Panel (TAP) recommended a roadmap to guide the disposition and redevelopment process of federal assets in Southwest Washington. The panel\u2019s work concluded that redevelopment of the James V. Forrestal Building, current U.S. Department of Energy (DOE) headquarters, would create a gateway from the National Mall to the Southwest Waterfront and unlock redevelopment opportunities along the 10th Street, SW corridor. ","date":"05\/22\/2025","author":"Marc Gazda, ULI Washington","link":"https:\/\/www.ncpc.gov\/news\/item\/249\/"},{"title":"NCPC Approves Final Texas Legation Memorial Plans","description":"At its Thursday, June 5 meeting the National Capital Planning Commission approved final site development plans submitted by the National Park Service, on behalf of the Daughters of the Republic of Texas, for the Texas Legation Memorial. The memorial will honor the Republic of Texas representatives who served in Washington as diplomats to the United States and made possible Texas becoming the twenty-eighth state.","date":"06\/06\/2025","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/250\/"},{"title":" NCPC Releases Monumental Core Streetscape Guide","description":"Within Washington\u2019s monumental core, streetscapes reinforce a special civic quality that inspires people and cultivates a sense of pride, permanence, and dignity. The Monumental Core Streetscape Guide and Construction Manual provides guidelines for federal and local agencies to achieve cohesive streetscapes that reinforce the iconic form and identity of the nation's capital.","date":"06\/23\/2025","author":"Benjamin Turpin","link":"https:\/\/www.ncpc.gov\/news\/item\/251\/"},{"title":"NCPC Welcomes New Chairman and Presidential Appointees ","description":"The Thursday, July 10 National Capital Planning Commission (NCPC) meeting was the first led by new Chairman William Scharf (At-Large). He, and Presidential Appointees Stuart Levenbach (Maryland) and Michael Blair (Virginia) were appointed to the Commission by President Donald J. Trump on July 9, 2025.","date":"07\/14\/2025","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/252\/"},{"title":"NCPC Receives Federal Planning Award ","description":"The American Planning Association\u2019s Federal Planning Division presented the Workplace Scenario Planning Study, developed by NCPC and the Metropolitan Washington Council of Governments, with the Outstanding Technical Planning Project Honor award.","date":"07\/23\/2025","author":"Bsrat Mezghebe","link":"https:\/\/www.ncpc.gov\/news\/item\/253\/"},{"title":"NCPC Approves Final Capital One Arena Improvements Plans","description":"At its Thursday, September 4 meeting the National Capital Planning Commission approved final building plans for proposed Capital One Arena improvements submitted by the District of Columbia Office of the Deputy Mayor for Planning and Economic Development and Monumental Sports & Entertainment. The plans would redesign the arena to transform it into a dynamic gathering location that better blends in with its surroundings, is a catalyst for future neighborhood improvements, and is furthered as a centrally located entertainment venue.","date":"09\/05\/2025","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/254\/"},{"title":"NCPC Provides Input on Potential Women's Suffrage National Monument Sites","description":"At its Thursday, December 4 meeting the National Capital Planning Commission provided input on four potential sites for the Women\u2019s Suffrage National Monument submitted by the National Park Service in collaboration with the Women\u2019s Suffrage National Monument Foundation. The four potential sites are Constitution Gardens West, Constitution Gardens East, Hockey Fields East, and Washington Monument South. The proposed monument will commemorate the women\u2019s suffrage movement and the passage of the 19th Amendment to the U.S. Constitution.","date":"12\/05\/2025","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/255\/"},{"title":"NCPC Provides Input on National Mall Telecom Infrastructure Concepts","description":"At its Thursday, January 8 meeting the National Capital Planning Commission provided comments on concept plans submitted by the National Park Service for National Mall and Memorial Parks Telecommunications Infrastructure Improvements. The Park Service seeks to create a planning and technical framework to guide wireless telecommunications infrastructure installations across the National Mall and surrounding areas to improve cellular service fivefold for visitors. The plan would provide guidance for the necessary infrastructure needed to achieve this goal ","date":"01\/09\/2026","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/256\/"},{"title":"NCPC Provides Feedback on New Stadium on RFK Campus","description":"At its Thursday, February 6 meeting the National Capital Planning Commission provided comments on concept plans submitted by the Office of the Mayor of the District of Columbia for the New Stadium at RFK Campus. Plans call for a new domed 65,000-seat stadium for the Washington Commanders on the site of the old Robert F. Kennedy Memorial Stadium. The entire campus master plan will include five districts, but the Commission\u2019s review is focused on the approximately 30-acre Stadium District.","date":"02\/06\/2026","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/257\/"},{"title":"NCPC Will Take Action on the East Wing Modernization Project at Its April 2, 2026 Meeting","description":"At its Thursday, March 5 meeting the National Capital Planning Commission heard a presentation on preliminary and final site and building plans for the East Wing Modernization Project submitted by the Executive Residence at the White House. Following the presentation by NCPC staff and the project design team, Commissioners asked questions and heard testimony from members of the public.","date":"03\/09\/2026","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/258\/"},{"title":"NCPC Approves East Wing Modernization Plans","description":"At its Thursday, April 2 meeting the National Capital Planning Commission deliberated and then voted to approve preliminary and final site and building plans for the East Wing Modernization Project. The project includes a permanent, secure event space within the White House grounds that will provide increased capacity for official state functions. ","date":"04\/06\/2026","author":"Stephen Staudigl ","link":"https:\/\/www.ncpc.gov\/news\/item\/259\/"},{"title":"Pennsylvania Avenue\u2019s Design Concepts Available for Public Review and Feedback","description":"At the National Capital Capital\u2019s Planning Commission\u2019s (NCPC) April 2 meeting, the Commission received and commented on a range of design concept alternatives that are now available for public review and feedback. General Services Administration (GSA) Administrator Ed Forst also announced at the meeting that GSA is funding additional technical assistance, including an underground site survey that will efficiently advance design development and implementation.","date":"04\/21\/2026","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/260\/"},{"title":"NCPC Provides Comments on the Eisenhower Executive Office Building Exterior Beautification Project","description":"At its Thursday, May 7 meeting the National Capital Planning Commission provided comments on concept plans for the Eisenhower Executive Office Building Exterior Beautification Project to the project applicant. The Commission will consider preliminary and final approval of the project in the future. ","date":"05\/08\/2026","author":"Stephen Staudig;","link":"https:\/\/www.ncpc.gov\/news\/item\/261\/"},{"title":"NCPC Provides Comments on the New Monumental Arch","description":"At its Thursday, June 4 meeting the National Capital Planning Commission provided comments on concept plans submitted by the U.S. Department of the Interior for a New Monumental Arch. The arch would be located in Memorial Circle on Columbia Island, located at the west terminus of Arlington Memorial Bridge in Washington, DC. The applicant said the arch would celebrate the triumphs of the American people, inspire patriotism and love of country, and beautify the nation\u2019s capital. The overall height from the base to the top of the statuary would be 250 feet.","date":"06\/05\/2026","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/263\/"},{"title":"America Celebrates 250 Years ","description":"The National Capital Planning Commission joins the nation in celebrating the 250th anniversary of the signing of the Declaration of Independence.","date":"06\/29\/2026","author":"Chairman Will Scharf","link":"https:\/\/www.ncpc.gov\/news\/item\/262\/"},{"title":"NCPC Approves New Monumental Arch Preliminary Site and Building Plans","description":"At its Thursday, July 9 meeting the National Capital Planning Commission approved preliminary site and building plans submitted by the U.S. Department of the Interior for a New Monumental Arch, with comments to be addressed prior to final review. The arch would be located in Memorial Circle on Columbia Island, located at the west terminus of Arlington Memorial Bridge in Washington, DC.","date":"07\/10\/2026","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/264\/"},{"title":"NCPC Honored for Monumental Core Planning Initiatives","description":"NCPC is excited to receive awards from the American Planning Association and the American Society of Landscape Architecture that recognize the agency as a proud leader of planning in the National Capital Region.","date":"08\/19\/2026","author":"Wilton Oliver","link":"https:\/\/www.ncpc.gov\/news\/item\/265\/"},{"title":"President Trump Appoints Mark Paoletta National Capital Planning Commission Chairman","description":"On August 26, 2026 President Donald Trump appointed Mark Paoletta as the at-large Presidential appointee to the National Capital Planning Commission (NCPC) and designated him to serve as Commission Chairman. His first Commission meeting will be on Thursday, September 3, 2026. ","date":"08\/31\/2026","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/266\/"},{"title":"NCPC Executive Director Marcel Acosta to Retire After 25 Years of Federal Service","description":"The National Capital Planning Commission (NCPC) announced today that Executive Director Marcel Acosta will retire from federal service effective September 18, 2026, following his acceptance of a private-sector position. Acosta has led NCPC\u2019s professional staff since 2008 and joined the agency in 2001 as Deputy Executive Director.","date":"09\/03\/2026","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/268\/"},{"title":"NCPC Provides Initial Input on Lafayette Park Security Improvement Plans","description":"At its Thursday, September 3 meeting the National Capital Planning Commission (NCPC) provided comments on concept plans for Lafayette Park Security Improvements to the U.S. Secret Service and Executive Office of the President, which submitted the project in coordination with the National Park Service. Plans call for security and access improvements at Lafayette Park and its surrounding streets including a new eight- to ten-foot height fence and gates around the perimeter. ","date":"09\/08\/2026","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/269\/"},{"title":"NCPC Provides Initial Input on RFK Stadium Campus Parking Garages","description":"At its Thursday, October 1 meeting the National Capital Planning Commission (NCPC) provided comments on concept plans for the RFK Campus New Stadium Parking Garages submitted by the Mayor of the District of Columbia, RFK Stadium Project Management Office in partnership with the Washington Commanders. Plans call for two structured parking garages that will accommodate 6,000 parking spaces and be completed in time for the stadium\u2019s opening in 2030. The garages current location is identified in a campus master plan prepared by the District Office of Plannin","date":"10\/02\/2026","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/270\/"},{"title":"NCPC Approves New Monumental Arch Final Site and Building Plans ","description":"At its Thursday, November 5 meeting the National Capital Planning Commission (NCPC) approved final site and building plans submitted by the U.S. Department of the Interior (DOI) for a New Monumental Arch. The arch would be located in Memorial Circle on Columbia Island at the west terminus of Arlington Memorial Bridge in Washington, DC. The 250-foot-tall arch would be topped with gold statuary.","date":"11\/06\/2026","author":"Stephen Staudigl","link":"https:\/\/www.ncpc.gov\/news\/item\/271\/"}]